BID SUMMARY
<br />fSa~ t~s
<br />PROJECT TITLE: Wicks and Blue Dolphin Lift Station Rehabilitation Protect
<br />PROJECT NO.: 08-693-ii2-243
<br />BID NO.: 09-10.013
<br />BID OPENING
<br />• DATE: Wednesday, March 10, 2010
<br />TIME: 11:00 AM
<br />LOCATION: Clty Clerk ENGINEER'S ESTIMATE
<br />Date Approved: 1/6/2010
<br />Prepared by: KC Redwood Eng. Construction
<br />2336 EI Camino Real
<br />Redwood City, CA 94063
<br />Phone: 925-819-2960
<br />Fax:650-368-9915 Con-Quest Contractors, Inc.
<br />290 Toland Street
<br />San Francisco, CA 94124
<br />Phone: 415-208-0524
<br />Fax: 415-206-0528 Anderson Pa~c Eng. Const.
<br />1390 Norman Avenue
<br />Santa Clara, CA 95054
<br />Phone: 408-970-9900
<br />Fax:408-970-9975 .
<br />ITEM
<br />NO. QUANTITY ITEM UNiT COST ITEM COST UNIT COST ITEM COST 372b0 ITEM COST UNIT COST ITEM COST
<br />1 1 LS Mobilization 8 Demobilization $36,750.00 $36,750.00 $25,000.00 $25,000.00 $37,250.00 $37,250.00 $35,000.00 $35,000.00
<br /> (Not to exceed 5% of total
<br /> contract)
<br />2 1 LS Traffic Control & Construction $10,500.00 $10,500.00 $15,000.00 $15,000.00 $7,500.00 $7,500.00 $40,000.00 $40,000.00
<br /> Area Signs
<br />3 1 LS Dust Control $10,500.00 $10,500.00 $15,000.00 $15,000.00 $1,500.00 $1,500.00 $3,000.00 $3,000.00
<br />4 1 LS Temporary Waste Water $15,750.00 $15,750.00 $20,000.00 $20,000.00 $15,000.00 $15,000.00 $35,000.00 $35,000.00
<br /> Bypass-Wicks Lift Station
<br />5 1 LS Temporary Waste Water $5,250.00 $5,250.00 $15,000.00 $15,000.00 $20,000.00 $20,000.00 $4,000,00 $4,000.00
<br /> Bypass-Blue Dolphin tiff Station
<br />i 6 1,328 LF 10-inch PVC Sanitary Sewer $148.35 $197,008.80 $50.00 $66,400.00 $100.00 $132,800.00 $150.00 $199,200.00
<br /> Forcemain
<br />7 110 LF 14-inch Ductile Iron Forcemain $157.50 $17,325.00 $400.00 $44,000.00 $395.00 $43,450.00 $600.00 $66,000.00
<br />8 20 LF 8-inch PVC Sanitary Sewer $136.50 $2,730.00 $150.00 $3,000.00 $100.00 $2,000.00 $400.00 $8,000.00
<br />9 1 ,EA Permanent 14-inch forcemain $15,750.00 $15,750.00 $9,600.00 $9,600.00 $60,000.00 $60,000.00 $9,000.00 $9,000.00
<br /> bypass connection
<br />• 10 3 EA Permanent 10-Inch forcemain $12,600.00 $37,800.00 $15,000.00 $45,000.00 $20,000.00 $60,000.00 $20,000.00 $60,000.00
<br /> maintenance bypass
<br />11 t LS Wicks Lift Station-complete in $299,250.00 $299,250.00 $250,000.00 $250,000.00 $193,000.00 $193,000.00 $300,000.00 $300,000.00
<br /> place
<br />This document is a summary of. bids received for the subject project and are
<br />provided only as a convenience. Listing of a particular bid is not a finding that such
<br />bid has been found to be responsive or accepted as complete by the City. An award
<br />of contract, if any, is subject to approval of the City Council andlor the City Manager.
<br />Contractors should refer to the contract documents for bidding information.
<br />Bid Summary - Nicks and Blue Dolphin Lilt Station Rehab Project.~dsx Page 1 of 4 Printed 3/10/2010 (~ 2:50 PM