Laserfiche WebLink
BID SUMMARY <br />fSa~ t~s <br />PROJECT TITLE: Wicks and Blue Dolphin Lift Station Rehabilitation Protect <br />PROJECT NO.: 08-693-ii2-243 <br />BID NO.: 09-10.013 <br />BID OPENING <br />• DATE: Wednesday, March 10, 2010 <br />TIME: 11:00 AM <br />LOCATION: Clty Clerk ENGINEER'S ESTIMATE <br />Date Approved: 1/6/2010 <br />Prepared by: KC Redwood Eng. Construction <br />2336 EI Camino Real <br />Redwood City, CA 94063 <br />Phone: 925-819-2960 <br />Fax:650-368-9915 Con-Quest Contractors, Inc. <br />290 Toland Street <br />San Francisco, CA 94124 <br />Phone: 415-208-0524 <br />Fax: 415-206-0528 Anderson Pa~c Eng. Const. <br />1390 Norman Avenue <br />Santa Clara, CA 95054 <br />Phone: 408-970-9900 <br />Fax:408-970-9975 . <br />ITEM <br />NO. QUANTITY ITEM UNiT COST ITEM COST UNIT COST ITEM COST 372b0 ITEM COST UNIT COST ITEM COST <br />1 1 LS Mobilization 8 Demobilization $36,750.00 $36,750.00 $25,000.00 $25,000.00 $37,250.00 $37,250.00 $35,000.00 $35,000.00 <br /> (Not to exceed 5% of total <br /> contract) <br />2 1 LS Traffic Control & Construction $10,500.00 $10,500.00 $15,000.00 $15,000.00 $7,500.00 $7,500.00 $40,000.00 $40,000.00 <br /> Area Signs <br />3 1 LS Dust Control $10,500.00 $10,500.00 $15,000.00 $15,000.00 $1,500.00 $1,500.00 $3,000.00 $3,000.00 <br />4 1 LS Temporary Waste Water $15,750.00 $15,750.00 $20,000.00 $20,000.00 $15,000.00 $15,000.00 $35,000.00 $35,000.00 <br /> Bypass-Wicks Lift Station <br />5 1 LS Temporary Waste Water $5,250.00 $5,250.00 $15,000.00 $15,000.00 $20,000.00 $20,000.00 $4,000,00 $4,000.00 <br /> Bypass-Blue Dolphin tiff Station <br />i 6 1,328 LF 10-inch PVC Sanitary Sewer $148.35 $197,008.80 $50.00 $66,400.00 $100.00 $132,800.00 $150.00 $199,200.00 <br /> Forcemain <br />7 110 LF 14-inch Ductile Iron Forcemain $157.50 $17,325.00 $400.00 $44,000.00 $395.00 $43,450.00 $600.00 $66,000.00 <br />8 20 LF 8-inch PVC Sanitary Sewer $136.50 $2,730.00 $150.00 $3,000.00 $100.00 $2,000.00 $400.00 $8,000.00 <br />9 1 ,EA Permanent 14-inch forcemain $15,750.00 $15,750.00 $9,600.00 $9,600.00 $60,000.00 $60,000.00 $9,000.00 $9,000.00 <br /> bypass connection <br />• 10 3 EA Permanent 10-Inch forcemain $12,600.00 $37,800.00 $15,000.00 $45,000.00 $20,000.00 $60,000.00 $20,000.00 $60,000.00 <br /> maintenance bypass <br />11 t LS Wicks Lift Station-complete in $299,250.00 $299,250.00 $250,000.00 $250,000.00 $193,000.00 $193,000.00 $300,000.00 $300,000.00 <br /> place <br />This document is a summary of. bids received for the subject project and are <br />provided only as a convenience. Listing of a particular bid is not a finding that such <br />bid has been found to be responsive or accepted as complete by the City. An award <br />of contract, if any, is subject to approval of the City Council andlor the City Manager. <br />Contractors should refer to the contract documents for bidding information. <br />Bid Summary - Nicks and Blue Dolphin Lilt Station Rehab Project.~dsx Page 1 of 4 Printed 3/10/2010 (~ 2:50 PM <br />