My WebLink
|
Help
|
About
|
Sign Out
Home
3A Public Hearing 2010 0503
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2010
>
Packet 2010 0503
>
3A Public Hearing 2010 0503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 8:23:39 AM
Creation date
4/29/2010 11:35:25 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/3/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 0503
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0503
Reso 2010-043
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
Reso 2010-044
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Construction activity shall not create dust, noise or safety hazards for adjacent <br />residents and properties. Dirt and mud shall not be tracked from the project site <br />during construction. <br />C. Standard construction dust control procedures, such as wetting, daily roadwashing <br />and other maintenance functions to control emissions, shall be implemented at all <br />times during outdoor construction. Dust generating activities such as grading, <br />excavation, paving etc., shall be scheduled the early morning and other hours <br />when wind speeds are low. All construction activities entailing soil disturbance <br />shall cease when winds exceed 30 miles per hour as an hourly average. <br />D. The developer shall prepare a construction truck route plan that would restrict <br />trucks to arterial streets that have sufficient pavement section to bear the heavy <br />truck traffic, thereby minimizing noise and traffic impacts to the community. The <br />construction truck route plan shall be reviewed and approved by the City Traffic <br />Engineer prior to receipt of the grading permit. <br />E. Truck hauling activities shall be restricted to 8:00 a.m. to 5:00 p.m. There shall be <br />no truck hauling activity on Saturdays, Sundays and legal holidays. <br />F. Procedures with the highest noise potential shall be scheduled for daylight hours, <br />when ambient noise levels are highest. <br />G. The contractor(s) shall be required to employ the quietest among alternative <br />equipment or to muffle/control noise from available equipment. <br />H. All construction contracts shall include the following requirements: 1) Unpaved <br />construction sites shall be sprinkled with water at least twice per day; 2) Trucks <br />hauling construction materials shall be covered with tarpaulins or other effective <br />covers; 3) Streets surrounding demolition and construction sites shall be swept at <br />least once per day; and 4) Paving and planting shall be done as soon as possible. <br />City shall charge developer, and developer shall pay, for all costs of sweeping city <br />streets in the vicinity of the project as necessary to control dust and spillage. <br />I. The property shall be secured during construction with a six (6) foot high chain <br />link fence and any other security measures in accordance with recommendation of <br />the San Leandro Police Department. <br />PLN2009-00030 Page 14 of 14 <br />Recommended Conditions of Approval April 22, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.