My WebLink
|
Help
|
About
|
Sign Out
Home
3A Public Hearing 2010 0503
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2010
>
Packet 2010 0503
>
3A Public Hearing 2010 0503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 8:23:39 AM
Creation date
4/29/2010 11:35:25 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date ā(6)ā
5/3/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 0503
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0503
Reso 2010-043
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
Reso 2010-044
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 6 - E <br />ANNUAL PUBLIC WORKS MAINTENANCE EXPENSES <br />FISCAL IMPACT ANALYSIS <br />PROPOSED KAISER PERMANENTE MEDICAL CENTER <br />CITY OF SAN LEANDRO, CA <br />I⢠MAINTENANCE OF NEW PUBLIC IMPROVEMENTS 111 <br />Pavement <br />Street lights <br />Traffic Signals <br />Subtotal Maintenance of New Public Improvements <br />II. MAINTENANCE OF EXISTING STREETS tet <br />III. PUBLIC WORKS ADMINISTRATION, PARKS, & FACILITIES <br />BASIS MEASURE TOTAL <br />9,000 New Street ROW (SY) $2.31 /SY/Yr $21,000 <br />17 Added Street Lights $100 Each $1,700 <br />3 Added Traffic Signals $1,200 Each $3,600 <br />$26,000 <br />$75,200 <br />767 Resident Equivalents $26.90 /Res Equiv.(3) $21,000 <br />TOTAL PUBLIC WORKS EXPENSE $122,200 <br />Notes: <br />(1) Estimated by the City of San Leandro Engineering and Transportation Department <br />Street Maintenance Costs, 20091/10 budget <br />(2) (Table A-2) <br />$2,376,603 <br />Kaiser Phase 1 Vehicle miles traveled <br />18,296 <br />2015 total VMT with Kaiser Phase 1 <br />578,561 <br />Kaiser % of total VMT <br />3% <br />Kaiser share of annual budget <br />$75,156 <br />(3) Cost Per Resident Equivalent: <br />PW Expenses in 2009-10 (Table A -2) $3,469,871 <br />Percent Variable Costs 75% <br />Resident Equivalents (Table 3) 96,728 <br />Per Resident Equivalent $26.90 <br />PREPARED BY: KEYSER MARSTON ASSOCIATES. INC. <br />\\Sf-fs1\wp\19\19096\19096.036\san leandro fiscal 04.27.10.xis; 6e PW; 4/28/2010; dd <br />
The URL can be used to link to this page
Your browser does not support the video tag.