My WebLink
|
Help
|
About
|
Sign Out
Home
3A Public Hearing 2010 0503
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2010
>
Packet 2010 0503
>
3A Public Hearing 2010 0503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 8:23:39 AM
Creation date
4/29/2010 11:35:25 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/3/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 0503
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0503
Reso 2010-043
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
Reso 2010-044
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the City's Design Standards, Specifications and Standard Plans unless otherwise <br />specifically approved by the City Engineer. <br />H. Applicant shall provide accessibility traffic signal equipment at all project <br />constructed signal locations. <br />I. Applicant shall have public and private site improvements designed and stamped <br />by a civil engineer registered to practice within the State of California. Applicant <br />shall obtain approval of the City Engineer for all on and off site improvements <br />prior to the issuance of Building Permits for the project. All improvements <br />within the City right-of-way shall be per City Standards. Improvements shall be <br />designed so that storm water does not impact pedestrian travel along sidewalks or <br />across streets. <br />J. Applicant shall enter into a Public Improvement Agreement or complete all <br />public improvements prior to issuance of Building Permits for the subject project <br />for the condition of 2015 Baseline plus Kaiser Medical Phase 1 described in the <br />EIR. The improvement to be completed shall be in substantial conformance to <br />these described in the COA, those identified in Exhibits 1-57 submitted for the <br />project dated April 14, 2010 and as described as Off-site Roadway Improvements <br />and identified mitigations improvements in the Final and Draft Environmental <br />Impact Report (F/DEIR) dated January 2010/April 2010. <br />K. Applicant shall prepare all required documents to implement a Plan Line to <br />provide an additional left turn lane from southbound Merced Street to eastbound <br />Republic Avenue prior to issuance of certificate of occupancy for the HSB. This <br />requirement may be modified or expanded by the terms of the Development <br />Agreement for the project. <br />L. Applicant shall provide an adaptive traffic control system for all public traffic <br />signals installed or modified by this project. Applicant shall connect all new <br />public traffic signals to the city's fiber optic network and provide communication <br />between the signal controller and the City's Advanced Traffic Management <br />System. <br />M. Applicant shall locate all utilities serving the site underground. <br />N. Applicant shall provide street lighting along the entire project frontage to meet <br />current City standards. <br />O. Applicant shall comply with the regulations and provisions contained in the <br />City's Grading Ordinance, the City's Storm Water Pollution Prevention Permit, <br />and the National Pollutant Discharge Elimination System (NPDES), to the <br />satisfaction of the City Engineer. More information may be found at <br />www.cleanwaterprogram.org. <br />PLN2009-00030 Page 7 of 14 <br />Recommended Conditions of Approval April 22, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.