My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2010-046
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2010
>
Reso 2010-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2010 1:35:47 PM
Creation date
5/6/2010 1:21:32 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
5/3/2010
Retention
PERM
Document Relationships
3C Public Hearing 2010 0503
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0503
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TJlal <br />Tranipor~sion <br />Condulbnts <br />5. Determine the Cort per Trip Using the Interchange <br />Because all peak hour trips contribute to the need for interchange improvements, the total of all <br />trips is used as the divisor for the estimated capital cost of $27 million for all improvements. Only a <br />portion of this cost can be financed by new development -that is, only the increment of traffic <br />from new development in San Leandro, defined as new traffic from development within the four <br />quadrants depicted in Figure 1 less existing traffic at the interchange is used as a basis for traffic <br />impact fee supplements in this analysis. For sites with existing traffic, it is necessary to provide a <br />credit for existing traffic and only use the increment over existing traffic volumes created through <br />more intense development. <br />6. Define the Development Fees by Generalized Lond Use Categories <br />Once the cost per trip is determined, by using Trip Generation by the Institute of Transportation <br />Engineers, it is possible to estimate the fee per square foot of development or other suitable unit <br />such as a single house. This is a parallel procedure to how the current Development Fees for Street <br />Improvements (DFSI) were calculated. <br />.Page S <br />Final Report - Tragic Impact Fee Analysis for 1-880/Marina Interchange Improvement November 12, 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.