Laserfiche WebLink
MITIGATION MONITORING AND REPORTING PROGRAM <br />FOR THE KAISER SAN LEANDRO MEDICAL CENTER /MIXED-USE RETAIL DEVELOPMENT PROJECT <br />Environmental Impact <br />Mitigation Measures <br />Monitoring Responsibility Implementation and <br />Monitoring Timeline <br />determined by the City, shall be incorporated into the construction documents for the acoustical analysis are <br />project. incorporated into the <br />construction documents for <br />the project. <br />Public Services <br />PS-3. The proposed project could trigger <br />the need for new school facilities. This is <br />potentially significant impact. <br />PS-3.1 School Impact Fees. <br />Residential project developers shall pay school impact fees prior to the issuance of <br />occupancy permits, in conformance with Section 65996 of the State Government <br />Code. <br />San Leandro Planning Services <br />Division, <br />Prior to the issuance of <br />occupancy permits <br />Transportation <br />TR-1A. Under Baseline plus Kaiser <br />Medical Center Phase 1 conditions, the <br />project would cause a study intersection <br />to degrade to substandard levels of <br />service, resulting in a sign cant impact. <br />TR-1. Under Baseline plus Kaiser Medical <br />Center Phase 1 plus Mixed-Use Retail <br />Development conditions, the project <br />would cause several study intersections to <br />degrade to substandard levels of service <br />and create operational issues associated <br />with queuing, resulting in significant <br />impacts. <br />TR-1.1 Implement an adaptive traffic signal system along the Marina Boulevard and <br />Merced Street corridors. <br />The project sponsors shall contribute a fair share sum towards the development and <br />implementation of an adaptive traffic signal system that would include all the signals <br />along the Marina Boulevard corridor between Merced Street and Alvarado Street, <br />and along the Merced Street corridor between Marina Boulevard and Fairway Drive. <br />TR-1.2 Widen the north leg of the Republic Avenue/Merced Street intersection. <br />To mitigate the residual queuing impact at the Republic Avenue/Merced Street <br />intersection under Kaiser Medical Center Phase 1 plus Mixed-Use Retail <br />Development conditions, the project sponsors shall be required to contribute fair- <br />share funds towards the widening of the north leg of the intersection to provide two <br />left-turn lanes, one through lane, and one shared-through-right lane on the <br />southbound approach (as well as bike lanes in both directions in accordance with <br />the San Leandro Bicycle and Pedestrian Master Plan). <br />TR-1.3 Construct a new signalized driveway along Marina Boulevard into the Mixed- <br />Use Retail Development site and modify the cycle length and phasing sequence and <br />timings of the traffic signal after implementing the adaptive traffic signal system for <br />the Marina Boulevard corridor between Merced Street and Alvarado Street. <br />San Leandro Engineering & <br />Transportation Department , <br />Land Use Division, <br />Transportation Section - <br />Determination and collection of <br />fair share sum <br />San Leandro Engineering & <br />Transportation Department , <br />Land Use Division, <br />Transportation Section - <br />Determination and collection of <br />fair share sum <br />San Leandro Engineering & <br />Transportation Department , <br />Land Use Division, <br />Transportation Section - <br />Deterrrtination and collection of <br />Kaiser shall either enter into <br />a public improvement <br />agreement for these <br />improvements prior to <br />issuance of building permits <br />for Phase 1 of the Kaiser <br />Medical Center, or shall <br />make fair-share payments <br />prior to issuance of <br />certificates of occupancy for <br />Phase 1 buildings. <br />Kaiser shall either enter into <br />a public improvement <br />agreement for these <br />improvements prior to <br />issuance of building permits <br />for the Mixed-Use Retail <br />Development, or shall make <br />fair-share payments prior to <br />issuance of certificates of <br />occupancy for Mixed-Use <br />Retail buildings. <br />Kaiser shall either enter into <br />a public improvement <br />agreement for these <br />improvements prior to <br />issuance of building permits <br />April 22, 2010 Kaiser Permanente San Leandro Medical Center and Mixed-Use Retail Development Project 13/22 <br />