My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2010195830
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2010
>
Inst 2010195830
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2010 11:41:26 AM
Creation date
6/28/2010 2:59:00 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/16/2010
Recorded Document Type
Development Agreement
Retention
PERM
Document Relationships
Ord 2010-007
(Approved by)
Path:
\City Clerk\City Council\Ordinances\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MITIGATION MONITORING AND REPORTING PROGRAM <br />FOR THE KAISER SAN LEANDRO MEDICAL CENTER /MIXED-USE RETAIL DEVELOPMENT PROJECT <br />Monitoring Responsibility Implementation and <br />Environmental Impact Mitigation Measures Monitoring Timeline <br />TR-12. Under Cumulative plus Kaiser Mitigation Measure AO-2.1 described in Section 3.2, Air Quality, would require See above See above <br />Medical Center Phase 1 plus Mixed-Use implementation of a Transportation Demand Management (TDM) program. The <br />Retail Development with Aladdin Avenue proposed TDM program would reduce project trips through increased use of <br />conditions, the project would cause an alternative modes of transportation. This would help to reduce trips along I-880. <br />increase in the amount of vehicle traffic on <br />I-880 during the AM and PM peak hours Implementation of Mitigation Measure TR-9.6 (modify the cycle length at the Marina <br />of more than one percent of the freeway Boulevard/I-880 Southbound Ramps intersection and add an additional lane along <br />segment's design capacity and also result the I-880 southbound off-ramp). <br />in queuing impacts to the southbound 1- <br />880 offramp at Marina Boulevard during <br />the Saturday peak period. <br />TR-13. Under Cumulative plus Kaiser Implementation of Mitigation Measures TR-1.1 to TR-1.4, TR-9.1 to TR-9.7, and TR- See above See above <br />Medical Center Build-Out plus Mixed-Use 11.1 <br />Retail Development conditions, the project <br />would cause several intersections to TR-13.1 Restriae the Westbound Approach Lanes at the Davis Street/Phillios Lane San Leandro Engineering & Kaiser shall either enter into <br />degrade to substandard levels of service Intersection. Transportation Department , a public improvement <br />or increase traffic at locations that are Land Use Division, agreement for these <br />already operating at substandard levels, The project applicants shall contribute fair-share funds towards improvements to the Transportation Section - improvements prior to <br />thereby resulting in significant impacts Davis Street/Phillips Lane intersection such that the westbound shared through-right Determination and collection of issuance of building permits <br />under cumulative conditions. lane shall be converted to an exclusive through lane to provide one left-turn lane, fair share sum for the Medical Center <br /> two through lanes, and one right-turn lane Buildout, or shall make fair- <br /> TR-13.2 Increase roadwav capacity by adding a third left-turn lane on the westbound share payments prior to <br />issuance of certificates of <br /> aaaroach to Marina Boulevard/Merced Street intersection. occupancy for Medical <br /> Implementation of Mitigation Measures TR-1.1 and TR- 1.3 would mitigate impacts Center Buildout. <br /> during the AM and Saturday peak hours and improve the operations of the Marina <br /> Boulevard/Merced Street intersection. However, the intersection would continue to <br /> operate at asub-standard level with LOS E. Therefore, the project sponsors shall <br /> contribute fair-share funds towards an increase in roadway capacity at the Marina <br /> Boulevard/Merced Street intersection by adding a third left-turn lane on the Marina <br /> Boulevard westbound approach and a third receiving southbound through lane on <br /> southbound Merced Street. <br /> TR-13.3Adiust the cvcle length of the traffic signal at the Marina Boulevard/Wavne <br /> Avenue intersection through an adaptive traffic signal svstem and convert the <br /> eastbound right-turn lane to a shared through-right lane. <br /> Following the implementation of Mitigation Measures TR-1.1 and TR-9.2, the project <br /> sponsors shall contribute fair-share funds towards the modification of the cycle <br /> length through the adaptive signal system at the Marina BoulevardNVayne Avenue <br /> intersection. The traffic signal timing shall be modified to allow for optimized <br />April 22, 2010 Kaiser Permanente San Leandro Medical Center and Mixed-Use Retail Development Project 17!22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.