Laserfiche WebLink
<br /> <br />Short Term recommended plan- Four levels <br />San Leandro Downtown Plan <br /> <br />~n ~ <br />_J <br />r~ <br />..................... <br />1. Historic Plaza Renovation and <br />Estudillo-Bart Llnk <br />1.A Plaza renovation <br />1.6 Pedestrian corridor improvements <br />at Esrudillo <br />1.C Estudillo Gate with trees marks <br />clcax pedestrian path to dowarown <br />and BART <br />..................... <br />2. Pedestrian Improvements <br />2.A ATM moved from alley to mom <br />visible location <br />2.6 Improved pedestrian crossings over <br />E. 14m Strett and Davis Strcet <br />2.C Gathering space, joint use with <br />parking <br />2.D Washington Avenue Pedesaian <br />Improvements. <br />2.E Pedcstriaa crossing connecting <br />Peltoa Center to shops across W. <br />Juana <br />3. Parking Lot Improvements <br />3.A Improved E. 14ih Saeet - 3 lanes <br />with pazking on both sidzs <br />3.6 Pedestrian enhanmments to pazk- <br />ing lot <br />3.C Improved pazking and landscaping <br />on Hays and W. Juana <br />October 2000 <br />..................... <br />TON RIe NNAN 8 ASSOCIATES <br />O.d.+ Dem., PI+.M.y ./ Ldup. Andimn,. <br />65a .,. Sven PJv Ahv, G 98301 <br />Voice 650.x63.8880 Pss b5oJ23.1018 <br />