Laserfiche WebLink
<br />. , <br />(f) Construction activity shall not commence prior to 8:00 a.m. and shall cease by 5:00 p.m., <br />unless otherwise approved by the Director of Planning and Building. 'There shall be no construction activity <br />on Saturdays, Sundays and legal Holidays. <br />(g) Truck hauling activities shall be restricted to 8 a.m. - 5 p.m. There shall be no truck <br />hauling activity on Saturdays, Sundays and legal Holidays. <br />(h) The contractor shall be required to employ the quietest among alternative equipment or to <br />muffle/control noise from available equipment. <br />(i) Insofar as possible, noisy operations shall be performed off-site or on portions of the site <br />distant from residential neighborhoods. <br />(j) All construction contracts shall include the following requirements: 1) Unpaved <br />construction sites shall be sprinkled with water at least twice per day, 2) trucks hauling construction <br />materials shall be covered with tarpaulins or other effective covers, 3) streets surrounding demolition and <br />construction sites shall be swept at least once per day, and 4) paving and planting shall be done as soon as <br />possible. City shall charge applicant, and applicant shall pay, for all costs of sweeping city streets in the <br />vicinity of the project as necessary to control dust and spillage. <br />(k) All construction contracts shall include requirements that construction equipment avoid <br />unnecessary idling to reduce CO, ROG and NOx emissions. <br />(1) To the extent possible, construction activities, including vehicles and workers, shall be <br />excluded from sensitive areas throughout the construction period. Temporary fencing shall be installed <br />along the border between the development and the sensitive areas and shall be posted with signs clearly <br />stating that all construction vehicles and workers are prohibited from entering the sensitive areas. Fencing <br />and signage shall be installed prior to issuance of any building permits. Whenever necessary to ensure the <br />protection of sensitive areas the City may employ at applicant's expense consultants to inspect the <br />construction staking and construction activity. <br />TRACT MAP 7175 CHERRY WOOD -PHASE 3 <br />ABSTRACT OF SUBDIVISION IMPROVEMENT AGREEMENT (PUBLIC IMPROVEMENT) <br />C:\MAPS\TM7175\SUBIMPAGRPUBLIC.DOC <br />PAGE 15 OF 17 <br />