Laserfiche WebLink
• CONSTRUCTION COST ESTIMATE: Consultant shall prepare a construction cost <br />estimate 95% design completion for the improvements. <br />100% PLANS AND ESTIMATES <br />• MEETING: Consultant shall meet with City to discuss and collect City's review comments <br />on the 95% plans and estimates design completion. <br />• 100% PLANS: Consultant shall prepare signed bid plans incorporating City's comments on <br />the 95% document review. The plans will show detailed stationing of repair areas, valley <br />gutters, quantity tables, typical sections, cover sheet, construction details, survey control and <br />crown elevations. <br />• EARTHWORK QUANTITIES: Consultant shall calculate excavation for pavement <br />replacement sections based on signed bid plans. Consultant shall calculate earthwork <br />quantities using survey cross-sections and new crown grades. <br />• CONSTRUCTION COST ESTIMATE: Consultant shall prepare a construction cost <br />estimate for the signed bid plans for the improvements. <br />SCHEDULE: <br />70% Construction Documents and Cost <br />Estimate <br />95% Construction Documents and Cost <br />Estimate <br />100% Construction Documents and Cost <br />Estimate <br />DELIVERABLES: <br />4 weeks from receipt of `Notice to <br />Proceed' <br />2 weeks from receipt of City's <br />70% review comments <br />2 weeks from receipt of City's <br />95% review comments. <br />1. Signed construction plans showing detailed stationing of the repair areas, valley gutters, <br />quantity tables, typical sections, cover sheet, construction details, survey control and crown <br />elevations. The consultant shall furnish City with one set of signed construction plans on <br />vellum hardcopy and AutoCAD R14 electronic file formats respectively. <br />2. Detailed final estimated construction cost. <br />CITY TO PROVIDE: <br />1. Geotechnical study report <br />2. Title block in AutoCAD Rel. 14 electronic file format. <br />Exhibit A Page 2 of 3 <br />6/12/95 STP/CMAQ Reconstruction <br />