My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2001 DKS Associates
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2001
>
Agmt 2001 DKS Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2010 9:45:34 AM
Creation date
7/14/2010 3:47:31 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/4/2001
Retention
PERM
Document Relationships
Reso 2001-075
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. A detailed Engineer's Estimate for the work to be performed. <br />DKS engineering staff will modify the PS&E as needed and submit them to City at 60, 90 and <br />100 percent levels of completion, for City review and approval. Hard copies will be provided, <br />as well as electronic copies in AutoCAD, MS Word and MS Excel format. The final <br />approved PS&E documents will be signed and sealed, ready for advertising. The City will <br />provide the remainder of the contract documents, make the bid packages, and arrange <br />advertising and distribution of the bid packages. <br />Deliverables: PS&E at 60% complete, 90% complete and 100% complete stages, in hard <br />copy and electronic format <br />Task 3: Construction Assistance ($2,900) <br />Under this task, DKS will assist the City during construction, including the following: <br />1. Respond to questions from contractors and equipment suppliers/installers. <br />2. Review equipment submittals. <br />3. -Help resolve issues arising during construction and equipment installation. <br />4. Assist in acceptance testing and punch list preparation. <br />5. Assist in troubleshooting equipment and arranging repair/replacement of faulty <br />equipment, and dealing with suppliers over faulty equipment. <br />6. Coordination with the Contractor on the connection to City Hall. <br />Task 4 -Database and Graphics for Signals (Optional) <br />This task is optional and will require written authorization before we proceed. For the three <br />signals to be brought on-line to the ICONS system, DKS engineering staff will enter the <br />controller configuration parameters and timing parameters in the ICONS database. DKS <br />Exhibit A Page 3 of 4 <br />DKS Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.