My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2001 Rogers_Donald
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2001
>
Agmt 2001 Rogers_Donald
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2010 9:55:18 AM
Creation date
7/19/2010 9:55:17 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
10/1/2001
Retention
PERM
Document Relationships
Reso 2001-159
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2001.005 TESTING & QUALITY CONTROL - 0141n <br />Fire Station #lb <br />San Leandro, California <br />C. Adherence to Schedule: <br />When the testing laboratory is ready to test according to the established Schedule, but is prevented from <br />testing or taking specimens due to incompleteness of the Work, all extra charges for testing attributable to <br />delay may beback-charged to the Contractor and shall not be borne by the Owner. <br />3.04 ALTERNATIVE INSPECTION PROCEDURE <br />A. The Owner's Representative shall have the right to require alternative inspection procedure other than as <br />specified when, in the Owner's Representatives judgment, other inspections are required to demonstrate <br />compliance with the Contract. requirements. Costs of such alternative inspections will be borne by the Owner <br />if products are found to comply; otherwise, costs shall be borne by the Contractor. <br />3.65 TESTING INSPECTION AND REPORTS <br />A. One copy of all test reports shall be forwarded to the permitting building department by the testing agency. <br />.Such reports shall include all tests made, regardless of whether such tests indicate that the material is <br />satisfactory or unsatisfactory. Samples taken but not tested shall also be reported. Records of spedal <br />sampling operations shall also be reported. The reports shall show that the material or materials were <br />sampled and tested in accordance with the requirements of Titles 21 or Z2 and 24 and with the approved <br />specifications. Test reports shall show the specified design strength. They shall also state definitely <br />whether or not the material or materials tested comply with requirements. <br />B . Each testing agency shall submit to the permitting building department a verified report in duplicate <br />covering all of the tests which are required to be made by that agency during the progress of the Project. Such <br />report shall be furnished each time that work on the Project is suspended, covering the tests up to that tune, <br />and at the completion of the project, covering all tests. <br />C. Contractor shall notify the Owner's Representative/Engineer/Owner, in a timely fashion, for field <br />observations, review or approval as listed in the Testing, Inspection & Reporting Schedule (attached). <br />CJW Architecture <br />Revised: 14:17, S/24/Ol <br />01410-3 <br />aJ O ~ ~2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.