My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2001 Rogers_Donald (2)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2001
>
Agmt 2001 Rogers_Donald (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2010 10:16:49 AM
Creation date
7/19/2010 10:01:20 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
10/1/2001
Retention
PERM
Document Relationships
Reso 2001-160
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~,, <br />EXHIBIT A <br />SCOPE OF SERVICES <br />1. L7NDERSTANDING. The City plans to construct a new fire station at 14903 Catalina St. <br />San Leandro, CA. The building are to include wood roof framing, CMU walls, a concrete slab on <br />grade sub-floor, electrical, mechanical, and plumbing systems. Site work includes earth moving, <br />new driveways, parking areas, landscaping, sidewalk, signage, fuel storage, emergency generator, <br />and site drainage. Plans and specifications for the projects have been prepared by CJW <br />Architecture ("Architect"). <br />The City plans to enter into a separate contract with a contractor experienced in construction <br />("General Contractor") who will furnish all labor, materials, and equipment required to build the <br />project. The City plans to enter into a separate contract with a company experienced in <br />construction inspectoin ("Special Inspector") who will furnish all labor, materials, and equipment <br />required to fulfill the special inspection requirements as shown on the plans and specifications. <br />2. SCOPE OF WORK. <br />Provide services listed below for the duration of the project. Time of construction is 205 <br />working days, normal hours of construction are lam to 6pm. Work performed outside of normal <br />construction hours shall be compensated for at 1 %2 times the hourly rate listed in attachment B-1. <br />a. Project Inspector <br />Contractor shall perform the duties of a Project Inspector pursuant to the provisions of <br />Title 24 of the California Code of Regulations and Health and Safety Code Section 16021. <br />Contractor shall provide competent, adequate and continuous. inspection services as <br />Project Inspector as defined in Exhibit A-1 (Contract Document Section 01410 Rev <br />8/20/01). <br />Contractor shall make verified inspection reports pursuant to Title 24. Contractor shall act <br />under the supervision of the City and under the general direction of the "Architect". <br />b. Construction Phase Services <br />i. Field Inspection -Provide field inspection services to monitor compliance with plans <br />and specifications. <br />ii. Maintain "Record" drawings -Maintain one set of contract documents with up-to-date <br />information regarding all addendum, substitutions, clarifications, and change orders. <br />iii. Independent Inspection and Testing Services -Schedule and coordinate independent <br />inspection and testing services, both on site and off-site. <br />Exhibit A <br />6/12/95 <br />Page 1 of ~ <br />FIRE STATION i I - CATALINA <br />
The URL can be used to link to this page
Your browser does not support the video tag.