Laserfiche WebLink
1 <br />• Technical Specifications in CSI format in MS WORD 97 compatible format. 8-1/2 x 11 <br />sheets, stamped and signed title sheet <br />• Prepare Project Cost Opinion based on Final CDs <br />• Project Construction Schedule based on Final CDs <br />• Supporting calculations (as applicable) <br />Consultant Tasks: <br />• Respond and address City plan check comments <br />Ci Tasks: <br />• Complete application form and submit drawings to building department (City will waive <br />permit fees) <br />• Prepare boiler plate front section of specifications <br />• City to notice, publish, and distribute bid documents <br />3.0 SCHEDiJLE: <br />It is important that construction be completed before June 2002 to allow use of the facilities <br />during the summer recess. This required the construction documents to be completed by mid- <br />December to allow time for bidding and award of contract, as well as construction.. The <br />estimated timeframe for accomplishing the above tasks is as follows: <br />Task Approximate Schedule <br />Preliminary Design Documents October <br />Design Development Plans and Specifications November <br />Construction Document Plans and Specifications Early December <br />Exhibit A Page 2 of 2 <br />6/12/95 San Leandro Boys and Girls Club Lockers <br />