Laserfiche WebLink
c <br />.~ <br />ATTACHMENT B-1 <br />PROJECT BUDGET /SCHEDULE OF RATES <br />Basic Services: The Scope of Services described above shall be compensated for by a <br />lump sum fee of: THIRTEEN THOUSAND FIVE HUNDRED DOLLARS <br />($13,500.00}. <br />A breakdown of the above services (not including reimbursable expenses) by <br />phase is as follows: <br />1. Preliminary Design Drawings- $3,000 <br />2. Design Development Plans and Specifications- $4,000 <br />3. Construction Document Plans and Specifications- $6,500 <br />TOTAL $13,500 <br />Rate Schedule: The following are rates for professional services on this project and will <br />be the rates used for any additional services as required during the course of this <br />project: <br />1. Principal- $ 125.00 per hour <br />2. Project Manager- $ 95.00 per hour <br />3. Architect- $ 85.00 per hour <br />4. Sr. Drafter- $ 65.00 per hour <br />5. Inter. Drafter- $ 55.00 per hour <br />6. Jr. Drafter- $ 45.00 per hour <br />7. Clerical- $ 30.00 per hour <br />Reimbursable Expenses: In addition to basic compensation, an allowance of ONE <br />THOUSAND FIVE HUNDRED AND 00/100 DOLLARS ($1,000.00) shall be <br />provided for reimbursable expenses. <br />1. All reimbursable expenses shall be authorized in advance by the <br />City. <br />2. Reimbursable expenses will be billed at Peter Shutts, A.I.A's direct <br />cost, and shall include the following: <br />• Plotting and reproduction expense of Drawings and other <br />documents <br />• Special delivery and handling of documents and <br />correspondence such as courier and overnight delivery services, <br />if requested <br />• Travel and lodging expense associated with visits to the project <br />site <br />Exhibit B-1 Page 1 of 1 <br />6/12/95 San Leandro Boys and Girls Club Lockers <br />