Laserfiche WebLink
<br />i <br />EXHIBIT A <br />CITY ENGINEER'S REPORT <br />FOR <br />FINAL TRACT MAP 7053 <br />FINDINGS <br />Pursuant to the provisions of Section 7-1-315 of the San Leandro Municipal Code, I have <br />examined the Final Map for Tract 7053 and find that it is in substantial conformance with <br />approved Vesting Tentative Map, and that the developer has either satisfied or provided <br />security for the improvements in compliance with Title VII, Chapter 1 of the San Leandro <br />Municipal Code and the State Subdivision Map Act and requirements of the Conditions of <br />Approval for the Vesting Tentative Map Tract 7053 listed below. <br />CONDITIONS <br />I recommend the following Conditions of Approval for Vesting Tentative Tract Map 7053: <br />A. GENERAL COMMENTS <br />1. Site Improvement Plans for all on-site improvements and street improvement <br />plans for off-site improvements shall be prepared by a Registered Civil Engineer <br />and approved by the City Engineer prior to approval of the Final Map. All <br />improvements shall be designed and constructed in accordance with the City's <br />Subdivision Improvement Standards. Off-site improvements include, but are <br />not limited to, the following: Preda Street pavement rehabilitation, removal and <br />replacement of all concrete improvements along Preda Street along the project <br />frontages, drainage, utilities and landscaping; water mains and fire hydrants; <br />potential sanitary sewer system upsizing; utility undergrounding; and any other <br />off-site improvements listed herein, or as determined by the City Engineer to be <br />necessary for a complete and acceptable public improvement project. <br />2. Pursuant to Government Code Section 66020, including Section 66020 (d) (1), <br />the City HEREBY NOTIFIES the applicant for this Project that the 90-day <br />approval period (in which the applicant may protest the imposition of any fees, <br />dedications, reservations, or other exactions imposed on this Project by these <br />Conditions of Approval) will begin on the date of the conditional approval of <br />this Project. If the applicant/property owner fails to file a protest within this 90- <br />dayperiod, complying with all of the requirements of Government Code Section <br />66020, they will be legally barred from later challenging any such fees, <br />dedications, reservations or other exactions. <br />Page 1 of 9 Vesting Tentative Map 7053 <br />