Laserfiche WebLink
construction sites shall be swept at least once per day, and 4) paving and planting shall be done as soon as <br />possible. City shall charge applicant, and applicant shall pay, for all costs of sweeping city streets in the <br />vicinity of the project as necessary to control dust and spillage. <br />(k) All construction contracts shall include requirements that construction equipment avoid <br />unnecessary idling to reduce CO, ROG and NOx emissions. <br />(1) To the extent possible, construction activities, including vehicles and workers, shall be <br />excluded from sensitive areas throughout the construction period. Temporary fencing shall be installed <br />along the border between the development and the sensitive areas and shall be posted with signs clearly <br />stating that all construction vehicles and workers are prohibited from entering the sensitive areas. Fencing <br />and signage shall be installed prior to issuance of any building permits. Whenever necessary to ensure the <br />protection of sensitive areas the City may employ at applicant's expense consultants to inspect the <br />construction staking and construction activity. <br />(m) The Subdivider shall provide archaeological monitoring of all construction activities on the <br />site. There shall be an archaeologist on site at all times during excavation/grading activity. <br />(n) In the event that archaeological or historical resources are discovered during <br />excavation/grading, work shall be suspended and a qualified archaeologist or historian shall be hired at <br />Subdivider's expense to examine the findings and to recommend appropriate mitigation. Said mitigation <br />shall be reviewed and approved by the Planning Commission and City Council. <br />(o) All fill material imported to the project site shall be tested for toxicity. The applicant shall <br />submit the results of such testing to the City. Fill material which has toxicity levels in excess of permissible <br />local, state or federal levels shall not be used on the project site. <br />(p) All metal fences and ancillary structures in the right-of--way and in close proximity to the <br />transmission lines shall be grounded, in accordance with applicable specifications, to eliminate potential <br />electric shocks. Appropriate cautionary signing shall also be installed. <br />TRACT MAP 7053 RYLAND WOODCREEK <br />SUBDNISION IMPROVEMENT AGREEMENT (PRNATE IMPROVEMENT) <br />G:\ LD\ Maps\TM 7053\SUBIMPAGRprivate.doc <br />Page 15 of 16 <br />