My WebLink
|
Help
|
About
|
Sign Out
Home
RDA Reso 2000-004
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2000
>
RDA Reso 2000-004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2010 4:07:57 PM
Creation date
7/20/2010 4:52:46 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
2/22/2000
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Appendix E (Initial Study/Part 1) <br />C~ <br />Page 4 <br />6. Description of Project: The proposal is for an office park including a maximum of 180,000 <br />square feet of office space, a 13,000 square foot environmental education center, and a 503-car <br />tri-level parking garage, at the northeast corner of San Leandro Boulevard and Davis Street. The <br />project would be developed irl two phases with Phase I including development of Building A <br />(80,000 square feet, including a 6,000 square foot restaurant); Building B (50,000 square feet), <br />and '520 surface parking stalls. Phase II would include development of Building C (50,000 <br />square feet) and a 503-car tri-level parking garage (235 surface stalls would be retained, for a <br />total of 738 parking stalls on-site). Also included for purposes of environmental review, but to <br />be built and owned separately, is development of a 13,000 square foot environmental education <br />center. This building would be developed by Friends of the Creek at some time in the future <br />when development funds become available. Amenities for the office park would include a corner <br />plaza with fountain, a creek walk and areas for sitting. The proposal would require action by the <br />Redevelopment Agency to approve a Disposition and Development Agreement with Creekside <br />Associates, LLC for development of the 7.75-acre site. The site is currently vacant and was the <br />former location of the City's Corporation Yard and several residential and commercial <br />properties, vacated in the 1980's. A parcel map will also be processed to reserve the back <br />portion of the property for public ownership and development with a creekwalk and the <br />environmental education center. <br />Two previous applications (with the same applicant) for the project site were processed in 1997 <br />and 1998. The first proposal was for a large retail center, including a major grocery store. The <br />second proposal included smaller retail uses and 60 townhouse units. The first application <br />included an amendment to the Redevelopment Plan for the Plaza 2 Redevelopment Project <br />Expansion Area, which was approved. This amendment redesignated the project site from <br />"Residential or Office" to "Retail Sales, Office Facilities or Residential." The current proposal is <br />consistent with this amended land use designation. <br />7.3. The proposal to develop an 180,000 square foot office plaza on a vacant lot that previously <br />housed the City's Corporation Yard would represent a change in the existing pattern of <br />development. However, the Plaza 2 Redevelopment Plan gives a land use designation •for the <br />property of "Retail/Office/Residential". Therefore, the proposed project is consistent with the <br />existing land use designation. The appropriate infrastructure is available to connect future <br />improvements with existing utility lines, as this is an infill location. <br />8. The 7.75-acre site is a substantially flat, vacant site that was previously occupied by the City <br />of San Leandro Corporation Yard and several residential and commercial properties which were <br />acquired by the City for the San Leandro Boulevard street widening project in the late 1980's. <br />The Corporation Yard moved to its new location in the early 1980's and property acquisition for <br />the residential and commercial properties was completed in the late 1980's, prior to the street <br />widening project. There are no significant plants or animals, except for the area adjacent to the <br />creek. <br />Creekside Plaza IS-Part I <br />November 1999 <br />:~.__ s <br />
The URL can be used to link to this page
Your browser does not support the video tag.