My WebLink
|
Help
|
About
|
Sign Out
Home
RDA Reso 2000-004
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2000
>
RDA Reso 2000-004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2010 4:07:57 PM
Creation date
7/20/2010 4:52:46 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
2/22/2000
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />A traffic signal is warranted at Davis Street/Carpentier Street based on the estimated p.m. peak hour <br />volumes. However, this intersection is expected to operate at acceptable levels of service as a whole <br />with the addition of a westbound Davis Street left-turn lane and a southbound Carpentier Street right- <br />turn lane. If these roadway improvements are implemented, the intersection is expected to operate <br />acceptably without signalization. <br />Internal circulation seems adequate. However, access driveways have some critical issues. It is <br />recommended to restrict left-turns out of the southern San Leandro Boulevard (SLB) driveway <br />(closest to Davis Street) on SLB due to the anticipated delays (up to two minutes) for this movement <br />during the peak hours. The left-turn: movement onto SLB can be concentrated at the northern SLB <br />driveway, where the installation of a signal would facilitate this movement. However, due to limited <br />width available to accommodate an exclusive southbound left-turn lane at the northern SLB <br />driveway, all project traffic should use the existing southbound left-turn lane at the southern SLB <br />driveway. Although a signal is not warranted at the northem SLB driveway, the signal will greatly <br />reduce the delay (to about half a minute) for the left-turn movement exiting the .project site. Without <br />the signal, this left-turn movement will operate at LOS F. <br />~~ <br />San Leandro Creekside Plaza Business Park Traffic Study Page 3 <br />TJKM Transportation Consultants October 26, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.