Laserfiche WebLink
~. <br />LOS Software by TJKM Transportation Consultants <br />Condition: am peak hour; Existing+Project Conditions 10/25/99 <br />INTERSECTION 3 Carpentier/Davis Street City of San Leandro <br />Count Date Time Peak Hour AM PEAK <br />------------------------------------------------------------------------ <br />94 HCM Unsignal N/S CONTROL: STOP <br />12 0 10 E/W CONTROL: NONE <br />^ ( I I ^ MAJ ST SAT FLOW: <br />Th= 1900, Rt= 1650 <br />71 --- 1.0 1.1 1.1 1.1 1.1 --- 50 CRITICAL GAP ADJUST <br />-------------------- <br />534 ---> 2.1 (N0. OF LANES) 2.2<--- 1071' LEFT THRU RGHT <br />NB 0.0 0.0 0.0 <br />26 --- 1.1 1.1 1.1 1.1 1.1 --- 33 SB 0.0 0.0 0.0 <br />~ <--- ---> ~ f6 0.0 --- --- <br />v I I v WB 0.0 --- --- <br />N <br />W + E 0 10 SIGNAL WARRANTS: <br />S Urb=N, Rur=N <br />---ACCEL----------------~ -------z ---------PEAK HOUR------------------- <br />LANE X COMBO MOTOR -----FACTOR----- <br />FOR LT SU/RV VEH CYCLE LEFT THRU RGHT <br />------------------------------------------------------------------------ <br />N 0 0 0 0.90 0.90 0.90 <br />N 0 0 0 0.90 0.90 0.90 <br />- 0 0 0 0.90 0:90 0.90 <br />- 0 0 0 0.90 0.90 0.90 <br />_________________________________________________________ <br />ORIG ADJ ADJ CONFL PO? ACT MVMT MVT I APP APP <br />MOVEMENT VOL VOL GAP VOL CAP CAP DELAY LOS DELAY LOS <br />NB L 3 4 7.0 1913 63 44 26.1 D <br />T 0 0 6.5 1969 77 48 <br />R 10 12 5.5 311 963 963 <br />LTR 13 16 26.1 D <br />SB L 10 12 7.0 1927 62 43 56.1 F <br />T 0 0 6.5 1956 78 49 <br />R 12 t5 5.5 623 670 670 <br />LTR 22 27 56.1 F <br />EB L 71 87 5.5 1246 368 368 92.8 C 1.4 A <br />T 534 653 <br />R 26 32 <br />TR 560 685 0.0 A <br />WB L 33 40 5.5 622 794 794 363.3 F <br />T 1071 1309 <br />R 50 61 <br />LTR 1154 1410 363.3 F <br />------------------------------------------------------------------------- <br />------------------------------------------------------------------------- <br />INT TOTAL: 231.7 F <br />MINOR MOVEMENTS: (104.1) (F) <br />INT=PROJAM.INT,VOL=EXIST.AMV+PROJ.AMV,CAP=...LOSCAP.TAB <br />LOS Software by TJKM Transportation Consultants <br />------------------------------------------------------------------------ <br />------------------------------------------------------------------------ <br />Condition: pm peak hour; Existing+Project Conditions 10/25/99 <br />INTERSECTION 3 Carpentier/Davis Street City of San Leandro <br />Count Date Time Peak Hour PM PEAK <br />94 HCM Unsignal N/S CONTROL: STOP <br />68 0 46 E/W CONTROL: NONE <br />MAJ ST SAT FLOW: <br />^ Th= 1900, Rt= 1650 <br /><--- v ---> ~. <br />18 --- 1.0 1.1 1.1 1.1 1.1 --- 15 CRITICAL GAP ADJUST <br />-------------------- <br />1102 ---> 2.1 (N0. OF LANES) 2.2<--- 795 LEFT THRU RIGHT <br />NB 0.0 0.0 0.0 <br />15 --- 1.1 1.1 1.1 1.1 1.1 --- 6 SB 0.0 0.0 0.0 <br />~ <--- ---> ~ EB 0.0 --- --- <br />v I I v WB 0.0 --- --- <br />N <br />W + E 1 11 SIGNAL WARRANTS: <br />S Urb=Y, Rur=Y <br />------------------------------------------------------------------------ <br />ACCEL y X PEAK HOUR <br />LANE Y. COMBO MOTOR -----FACTOR----- <br />FOR LT SU/RV VEH CYCLE LEFT THRU RGHT <br />------------------------------------------------------------------------ <br />N 0 0 0 0.90 0.90 0.90 <br />N 0 0 0 0.90 0.90 0.90 <br />- 0 0 0 0.90 0.90 0.90 <br />- 0 0 0 0.90 0.90 0.90 <br />--------- ------------------------------------------------------------- <br />ORIG ADJ ADJ CONFL POT ACT MVMT MVT I APP APP <br />MOVEMENT VOL VOL GAP VOL CAP CAP' DELAY LOS DELAY LOS <br />NB L 2 2 7.0 2143 45 38 22.2 D <br />T 1 1 6.5 2159 59 55 <br />R 11 13 5.5 621 671 671 <br />LTR 14 16 22.2 D <br />SB L 46 56. -7.0 2143 45 41 332.1 F <br />T 0 0 6.5 2159 59 55 <br />R 68 83 5.5 450 819 819 <br />LTR 114 139 332.1 F <br />EB L 18 22 5.5 900 564 564 6.6 B 0.1 A <br />T 1102 1347 <br />R 15 18 <br />TR 1117 1365 0.0 A <br />WB L 6 7 5.5 1241 370 370 788.6 F <br />T 795 972 <br />R 15 18 <br />LTR 816 997 788.6 F <br />------------------------------------------------------------------------- <br />INT TOTAL: 327.9 F <br />MINOR MOVEMENTS: (283.1) (F) <br />------------------------------------------------------------------------- <br />INT=PROJPM.INT,VOL=EXIST.PMV+PROJ.PMV,CAP=...LOSCAP.TAB <br />r ~ <br />L J <br />u <br />