My WebLink
|
Help
|
About
|
Sign Out
Home
RDA Reso 2000-004
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2000
>
RDA Reso 2000-004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2010 4:07:57 PM
Creation date
7/20/2010 4:52:46 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
2/22/2000
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P'~ <br />LOS Software by TJKM Transportation Consultants <br />Condition: am peak hour; Existing + Project 10/20/99 <br />---------------------------------------------'__________________________ <br />INTERSECTION 5 Alvarado Street/Davis Street City of San Leandro <br />Count Date Time Peak Hour AM PEAK <br />------------------------------------------------------------------------ <br />85 HCM Operations ACTUATED,NON-CBD <br />11 17 19 80-SEC CYCLE <br />^ ~ I I PHASE GRN Y+R LOST <br />~ <--- v ---> ~ 1 EW-L 6 3 0.0 <br />67 --- 1.0 1.0 1.0 1.0 1.1 --- 98 2 EW-TR 58 4 0.0 <br />3 NS-LTR 5 4 0.0 <br />1180 ---> 2.1 (N0. OF LANES) 2.1<--- 1241 <br />128 --- 1.1 1.0 1.0 1.0 1.0 --- 131 <br /><--- ---> <br />N <br />W + E v 117 32 I81 v <br />S <br />------------------------------------------------------------------------- <br />RTOR CNFL PED W/ MIN PRK X BUS XHVY ARR PEAK HOUR SAT <br />APP VPH PEDS PHASE GRN ING GRA STP VEH TYP FACTOR FLOW <br />------------------------------------------------------------------------- <br />12345678 LT TH RT LEFT THRU RGHT <br />NB 0 0 0 N 0.0 0 2 2 2 3 0.90 0.90 0.90 1900 <br />SB 0 0 0 N 0.0 0 2 2 2 3 0.90 0.90 0.90 1900 <br />EB 0 0 0 N 0.0 0 2 2 2 3 0.90 0.90 0.90 1900 <br />WB 0 0 0 N 0.0 0 2 2 2 3 0.90 0.90 0.90 1900 <br />------------------------------------------------------------------------- <br />LANE ADJ PHASE _ LANE L APRCH <br />LANE ~ WIDTH ADJ SAT ORDER GROUP 0 DELAY <br />GROUP (FT.) VOL VOL FLOW V/S 12345678 G/C CAPAC V/C DELAY S $ LOS <br />NB L 12.0 117 130 1881 0.069 3 0.113 212 0.614* 29.4 DI 26.0 <br />T 12.0 32 36 1881 0.019 3 0.113 212 0.168 20.8 C D <br />---R 12.0 81 90 1599 0.056 3 0.113 180 0.500 23.1 C <br />SB L 12.0 19 21 1380 0.015 3 0.113 155 0.136 24.3 C 22.1 <br />T 12.0 17 t9 1881 0.010 3 0.113 212 0.089 20.6 CI C <br />---R---12.0 11 12 1599 0.008 3 0.113 180 0.068 20.5 C <br />EB L 12.0 67 74 1787 0.042 1 0.113 201 0.370 .25.5 D 3.5 <br />T 12.0 1180 2 A <br />R 12.0 128 2 <br />TR 12.0 1308 1526 3707 0.412 2 0.775 2873 0.531 2.4 A <br />WB L 12.0 131 146 1787 0.081 1 0.113 201 0.724 34.2 D 5.2 <br />T 12.0 1241 2 B <br />R 12.0 98 2 <br />TR 12.0 1339 1562 3721 0.420 2 0.775 2884 0.542* 2.4 A <br />*=CRITICAL LANE GROUP DELAY- 6.2 SEC/VEH V/C -0.57 LOS-B <br />INT=PROJAM.INT,VOL=EXIST.AMV+PROJ.AMV,CAP=...LOSCAP.TAB <br />LOS Software by TJKM Transportation Consultants <br />________________________________________________________________________ <br />Condition: pm peak hour;Existing + Project 10/20/99 <br />________________________________________________________________________ <br />INTERSECTION 5 Alvarado Street/Davis Street City of San Leandro <br />Count Date Time Peak Hour PM PEAK <br />85 HCM Operations ACTUATED,NON-CBD <br />55 30 95 80-SEC CYCLE <br />PHASE GRN Y+R LOST <br />~ <--- v ---> ~ 1 EW-L 5 3 0.0 <br />27 --- 1.0 1.0 1.0 1.0 1.1 --- 14 2 EW-TR 53 4 0.0 <br />3 NS-LTR 11 4 0.0 <br />1511 ---> 2.1 (N0. OF LANES) 2.1<--- 1221 <br />74 --- 1.1 1.0 1.0 1.0 1.0 --- 59 <br />~ <--I- I^ I---> <br />W N E v 156 13 185 v <br />S <br />RTOR CNFL PED W/ MIN PRK Y. BUS YHVY ARR PEAK HOUR SAT <br />APP VPH PEDS PHASE GRN ING GRA STP VEH TYP FACTOR FLOW <br />12345678 LT TH RT LEFT THRU RGHT <br />NB 0 0 0 N 0.0 0 2 2 2 3 0.90 0.90 0.90 1900 <br />SB 0 0 0 N 0.0 0 2 2 2 3 0.90 0.90 0.90 1900 <br />EB 0 0 0 N 0.0 0 2 2 2 3 0.90 0.90 0.90 1900 <br />WB 0 0 0 N 0.0 0 2 2 2 3 0.90 0.90 0.90 1900 <br />--------------------- <br />LANE ADJ PHASE LANE L APRCH <br />LANE WIDTH ADJ SAT ORDER GROUP 0 DELAY <br />GROUP (FT.) VOL VOL FLOW V/S 12345678 G/C CAPAC V/C DELAY S 8 LOS <br />NB L 12.0 156 173 1539 0.113 3 0.188 289 0.601 25.1 DI 23.9 <br />T 12.0 13 14 1881 0.008 3 0.188 353 0.041 17.2 C C <br />R 12.0 185 206 1599 0.129 3 0.188 300 0.686* 23.3 C <br />SB L 12.0 95 106 991 0.107 3 0.188 186 0.568 25.4 D 21.8 <br />T 12.0 30 33 1881 0.018 3 0.188 353 0.095 17.4 CI C <br />---R 12.0 55 61 1599 0.038 3 0.188 300 0.204 17.8 C <br />EB L 12.0 27 30 1787 0.01.7 1 0.100 179 0.168 25.1 0 5.1 <br />T 12.0 1511 2 e <br />R 12.0 74 2 <br />- -TR 12.0 1585 1849 3736 0.495 2 0.713 2662 0.695* 4.7 A <br />WB L 12.0 59 66 1787 0.037 1 0.100 179 0.367* 26.2 D 4.6 <br />T 12.0 1221 2 A <br />R 12.0 14 2 <br />TR 12.0 1235 1441 3756 0.384 2 0.713 2676 0.538 3.6 A <br />*=CRITICAL LANE GROUP DELAY= 7..7 SEC/VEH V/C =0.66 LOS=6 <br />------------------------------------------------------------------------- <br />INT=PROJPM.INT,VOL=EXIST.PMV+PROJ.PMV,CAP=...LOSCAP.TAB <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.