Laserfiche WebLink
1~ <br />E~ <br />LOS Software by TJKM Transportation Consultants <br />------------------------------------------------------------------------ <br />Condition: am peak hour; Existing+Project+Future Growth 10/25/99 <br />INTERSECTION 3 Carpentier/Davis Street 'City of San Leandro <br />Count Date Time Peak Hour AM PEAK <br />------------------------------------------------------------------------ <br />94 HCM Unsignal N/S CONTROL: STOP <br />12 0 10 E/W CONTROL: NONE <br />" I I I " MAJ ST SAT FLOW: <br />Th= 1900, Rt= 1650 <br />71 --- 1.0 1.1 1.1 1.1 1.1 --- 50 CRITICAL GAP ADJUST <br />-------------------- <br />608 ---> 2.1 (N0. OF LANES) 2.2<--- 1101 LEFT THRU RIGHT <br />NB 0.0 0.0 0.0 <br />29 --- 1.1 1.1 1.1 1.1 1.1 --- 33 SB 0.0 0.0 0.0 <br /><--- ---> ~ EB 0.0 --- --- <br />v ~ I I v W~ 0.0 --• --- <br />N <br />W + E 0 10 SIGNAL WARRANTS: <br />g Urb=N, Rur=N <br />ACCEL Y. X PEAK HOUR <br />LANE X COMBO MOTOR -----FACTOR----- <br />FOR LT SU/RV VEH CYCLE LEFT THRU RGHT <br />------------------------------------------------------------------------ <br />N 0 0 0 0.90 0.90 0.90 <br />N 0 0 0 '0.90 0_90 0.90 <br />- 0 0 0 0.90 0.90 0.90 <br />- 0 0 0 0.90 0.90 0.90 <br />ORIG ADJ ADJ CONFL POT ACT MVMT MVT APP APP <br />MOVEMENT VOL VOL GAP VOL CAP CAP DELAY LOS I DELAY LOS <br />NB L 6 7 7.0 2031 53 35 50.5 F <br />T 0 0 6.5 2086 66 39 <br />R 10 12 5.5 354 916 916 <br />LTR 16 19 50.5 F <br />SB L 10 12 7.0 2042 52 35 74.4 F <br />T 0 0 6.5 2074 67 39 <br />R 12 15 5.5 639 657 657 <br />LTR 22 27 74.4 F <br />EB L 71 87 5.5 1279 353 353 13.5 C 1.4 A <br />T 608 743 <br />R 29 35 <br />TR 637 778 0.0 A <br />WB L 33 40 5.5 708 715 715 475.9 F <br />T 1101 1346 <br />R 50 61 <br />LTR 1184 1447 475.9 F <br />- --------- <br />________________________________________________________________ <br />INT TOTAL: 293.7 F <br />MINOR MOVEMENTS: (134.6) (F) <br />----=-------------------------------------------------------------------- <br />INT=FUTAM.INT,VOL=EXIST.AMV+pROJ.AMV+FUTURE.AMV,CAP=...LOSCAP.TAB <br />LOS Software by TJKM Transportation Consultants <br />________________________________________________________________________ <br />Condition: pm peak hour; Existing+Project+Future Growth 10/25/99 <br />INTERSECTION 3 Carpentier/Davis Street City of San Leandro <br />Count Date Time Peak Hour PM PEAK <br />94 HCM Unsignal N/S CONTROL: STOP <br />68 0 46 E/W CONTROL: NONE <br />MAJ ST SAT FLOW: <br />Th= 1900, Rt= 1650 <br />~ <--- v ---> ~ <br />18 --- 1.0 1.1 1.1 1.1 1.1 --- 15 CRITICAL GAP ADJUST <br />-------------------- <br />1158 ---> 2.1 (N0. OF LANES) 2.2<--- 883 LEFT THRU RIGHT <br />NB 0.0 0.0 0.0 <br />20 --- 1.1 1.1 1.1 1.1 1.1 --- b SB 0.0 0.0 0.0 <br />---> ~ EB 0.0 --- --- <br />v <--- I I v WB 0.0 --- --- <br />N <br />W + E 1 11 SIGNAL WARRANTS: <br />S Urb=Y, Rur=Y <br />------------------------------------------------------------------------ <br />ACCEL X X PEAK HOUR <br />LANE X COMBO MOTOR -----FACTOR----- <br />' FOR LT SU/RV VEH CYCLE LEFT THRU RGHT <br />------------------------------------------------------------------------ <br />N 0 0 0 0.90 0.90 0.90 <br />N 0 0 0 0.90 0.90 0.90 <br />- 0 0 0 0.90 0.90 0.90 <br />- 0 0 0 0.90 0.90 0.90 <br />-=--------------------------------------------------------------------- <br />ORIG ADJ ADJ CONFL POT ACT MVMT MVT APP APP <br />MOVEMENT VOL VOL GAP VOL CAP CAP DELAY LOS I DELAY LOS <br />NB L 6 7 7.0 2306 36 30 65.8 F <br />T 1 1 6.5 2322 48 43 <br />R 11 13 5.5 654 645 645 <br />LTR 18 21 65.8 F <br />SB L 46 56 7.0 - 2303 36 32 520.6 F <br />T 0 0 6.5 2325 48 43 <br />R 68 83 5.5 499 774 774 <br />LTR 114 139 520.6 F <br />EB L 18 22 5.5 .998 499 499 7.5 B 0.1 A <br />T 1158 1415 <br />R 20 24 <br />TR 1178 1439 0.0 A <br />WB L 6 7 5.5 1309 340 340 999+ F <br />T 883 1079 <br />R 15 18 <br />LTR 904 1104 999+ F <br />- - - - - - --------- <br />______________________________________________ _ _ ____ _ __ ___ <br />INT TOTAL: 447.2 F <br />MINOR MOVEMENTS: (428.8) (F) <br />------------------------------------------------------------------------- <br />1NT=FUTPM.INT,VOL=EXIST.PMV+pROJ.PMV+FUTURE.PMV,CAP=...LOSCAP.TAB <br />• <br /> <br />