Laserfiche WebLink
~+'a <br />/'~ <br />LOS Software by TJKM Transportation Consultants <br />-------------------------- --- ---------------------------------- <br />---------------------------------------------- <br />Condition: am peak hour; Existing+Project+Future Growth 10/22/99 <br />INTERSECTION 5 Alvarado Street/Davis Street City of San Leandro <br />Count Date Time Peak Nour AM PEAK <br />85 HCM Operations ACTUATED,NON-CBD <br />97 41 100 80-SEC CYCLE <br />PHASE GRN Y+R LOST <br /><--- v ---> ~ 1 EW-L 6 3 0.0 <br />95 --- 1.0 1.0 1.0 1.0 1.1 --- 125 2 EW-TR 55 4 0.0 <br />3 NS-LTR 8 4 0.0 <br />1184 ---> 2.1 (N0. OF LANES) 2.1<--- 1254 <br />128 --- 1.1 1.0 1.0 1.0 1.0 --- 131 <br />N <br />W + E v 117 40 (81 v <br />S <br />---- -------------------------------------------------------------------- <br />RTOR CNFL PED W/ MIN PRK % BUS %HVY ARR PEAK HOUR SAT <br />APP VPH PEDS PHASE GRN ING GRA STP VEH TYP FACTOR FLOW <br />------------------------------------------------------------------------- <br />12345678 LT TH RT LEFT THRU RGHT <br />NB 0 0 0 N 0.0 0 2 2 2 3 0.90 0.90 0.90 1900 <br />SB 0 0 0 N 0.0 0 2 2 2' 3 0.90 0.90 0.90 1900 <br />EB 0 0 0 N 0.0 0 2 2 2 3 0.90 0.90 0.90 1900 <br />WB 0 0 0 N 0.0 0 2 2 2 3 0.90 0.90 0.90 1900 <br />------------------------------------------------------------------------- <br />------------------------------------------------------------------------- <br />LANE ADJ PHASE LANE L APRCH <br />LANE WIDTH ADJ SAT ORDER GROUP 0 DELAY <br />GROUP (fT.) VOL VOL FLOW V/S 12345678 G/C CAPAC V/C DELAY S & LOS <br />NB L 12.0 117 130 1242 0.105 3 0.150 186 0.698* 31.8 DI 25.7 <br />T 12.0 40 44 1881 0.024 3 0.150 282 0.158 19.1 C D <br />R 12.0 81 90 1599 0.056 3 0.150 240 0.375 20.2 C <br />SB L 12.0 100 111 1345 0.083 3 0.150 202 0.551 26.4 D 22.9 <br />T 12.0 41 46 1881 0.024 3 0.150 282 0.161 19.2 C C <br />R 12.0 97 108 1599 0.067 3 0.150 240 0.449 20.8 C <br />EB L 12.0 95 106 1787 0.059 1 0.113 201 0.525 27.5 D 4.8 <br />T 12.0 1184 2 A <br />R 12.0 128 2 <br />- TR 12.0 1312 1531 3707 0.413 2 0.738 2734 0.560 3.2 A <br />WB L 12.0 131 146 1787 0.081 1 0.113 201 0.724* 34.2 D 6.0 <br />T 12.0 1254 2 6 <br />R 12.0 125 2 <br />TR 12.0 1379 1609 3711 0.434 2 0.738 2737 0.588* 3.4 A <br />*=CRITICAL LANE GROUP DELAY= 8.1 SEC/VEH V/C =0.62 LOS=B <br />INT=FUTAM.INT,VOL=EXIST.AMV+PROJ.AMV+FUTURE.AMV,CAP=...LOSCAP.TAB <br />LOS Software by TJKM Transportation Consultants <br />------------------------------------------------------------------------ <br />Condition: pm peak hour; Existing+Project+Future Growth 10/22/99 <br />INTERSECTION 5 Alvarado Street/Davis Street City of San Leandro <br />Count Date Time Peak Hour PM PEAK <br />85 HCM Operations ~ ACTUATED,NON-CBD <br />110 45 147 80-SEC CYCLE <br />PHASE--- GRN Y+R LOST <br />125 --- 1.0 1.0 1.0 1.0 1.1 --- 107 2 EW-TR 50 4 0.0 <br />3 NS-LTR 14 4 0.0 <br />1526 ---> 2.1 (N0. OF LANES) 2.1<--- 1228 <br />74 --- 1.1 1.0 1.0 1.0 1.0 --- 59 <br />~ <---I I^ -I--> ~ <br />W N E v 156 40 185 v <br />S <br />RTOR CNFL PED W/ MIN PRK % BUS Y.HVY ARR PEAK HOUR SAT <br />APP VPH PEDS PHASE GRN ING GRA STP VEH TYP FACTOR FLOW <br />12345678 LT TH RT LEFT THRU RGHT <br />NB 0 0 0 N 0.0 0 2 2 2 3 0.90 0.90 0.90 1900 <br />SB 0 0 0 N 0.0 0 2 2 2 3 0.90 0.90 0.90 1900 <br />EB 0 0 0 N -0.0 0 2 2 2 3 0.90 0.90 0.90 1900 <br />WB 0 0 0 N 0.0 0 2 2 2 3 0.90 0.90 0.90 1900 <br />LANE ADJ PHASE LANE L APRCH <br />LANE WIDTH ADJ SAT ORDER GROUP 0 DELAY <br />GROUP (FT.) VOL VOL FLOW V/S 12345678 G/C CAPAC V/C DELAY S & LOS <br />NB L 12.0 156 173 1233 0.141 3 0.225 277 0.625 24.3 C 20.9 <br />T 12.0 40 44 1881 0.024 3 0.225 423 0.105 15.9 CI C <br />R 12.0 185 206 1599 0.129 3 0.225 360 0.571 19.2 C <br />SB L 12.0 147 163 952 0.172 3 0.225 214 0.763* 32.0 D 24.2 <br />T 12.0 45 50 1881 0.027 3 0.225 423 0.118 15.9 CI C <br />R 12.0 110 122 1599 0.076 3 0.225 360 0.340 17.0 C <br />EB L 12.0 125 139 1787 0.078 1 0.100 179 0.777* 39.5 D 8.6 <br />T 12.0 1526 2 B <br />R 12.0 74 2 <br />---TR 12.0 1600 1867 3736 0.500 2 0.675 2522 0.740* 6.2 B <br />WB L 12.0 59 66 1787 0.037 1 0.100 179 0.367 26.2 D 5.9 <br />T 12.0 1228 2 B <br />R 12.0 107 2 <br />TR 12.0 1335 1558 37170.419 2 0.675 2509 0.621 5.0 A <br />*=CRITICAL LANE GROUP DELAY- 10.1 SEC/VEH V/C -0.75 LOS-B <br />------------------------------------------------------------------------- <br />INT=FUTPM.INT,VOL=EXIST.PMV+PROJ.PMV+FUTURE.PMV,CAP=...LOSCAP.TAB <br />• <br /> <br />