Laserfiche WebLink
• <br /> (f) Construction activity shall not commence prior to 8:00 a.m. and shall cease by 5:00 p.m., <br /> unless otherwise approved by the Director of Planning and Building. There shall be no construction activity <br /> on Saturdays, Sundays and legal Holidays. <br /> (g) Truck hauling activities shall be restricted to 8 a.m.- 5 p.m. There shall be no truck hauling <br /> activity on Saturdays, Sundays and legal Holidays. <br /> (h) The contractor shall be required to employ the quietest among alternative equipment or to <br /> muffle /control noise from available equipment. <br /> (i) Insofar as possible, noisy operations shall be performed off -site or on portions of the site <br /> distant from residential neighborhoods. <br /> (j) All construction contracts shall include the following requirements: I) Unpaved <br /> construction sites shall be sprinkled with water at least twice per day, 2) trucks hauling construction <br /> materials shall be covered with tarpaulins or other effective covers, 3) streets surrounding demolition and <br /> construction sites shall be swept at least once per day, and 4) paving and planting shall be done as soon as <br /> possible. City shall charge applicant, and applicant shall pay, for all costs of sweeping city streets in the <br /> vicinity of the project as necessary to control dust and spillage. <br /> (k) All construction contracts shall include requirements that construction equipment avoid <br /> unnecessary idling to reduce CO, ROG and NO emissions. <br /> (1) To the extent possible, construction activities, including vehicles and workers, shall be <br /> excluded from sensitive habitat areas throughout the construction period. Temporary fencing shall be <br /> installed along the border between the development and the sensitive habitat areas and shall be posted with <br /> signs clearly stating that all construction vehicles and workers are prohibited from entering the sensitive <br /> habitat areas. Fencing and signage shall be installed prior to issuance of any building permits. Whenever <br /> necessary to ensure the protection of sensitive habitat areas the City may employ at applicant's expense <br /> consultants to inspect the construction staking and construction activity. <br /> TRACT MAP 7092 MEDALLION PHASE 2 <br /> SUBDIVISION IMPROVEMENT AGREEMENT (PUBLIC IMPROVEMENT) <br /> C:\MAPS \TM7092 \SUBIMP I.ABS <br /> PAGE 15 OF 17 <br />