Laserfiche WebLink
(m) The Subdivider shall provide archaeological monitoring of all construction activities on the <br /> site. There shall be an archaeologist on site at all times during excavation/grading activity. <br /> (n) In the event that archaeological or historical resources are discovered during <br /> excavation/grading, work shall be suspended and a qualified archaeologist or historian shall be hired at <br /> Subdivider's expense to examine the findings and to recommend appropriate mitigation. Said mitigation <br /> shall be reviewed and approved by the Planning Commission and City Council. <br /> (o) All fill material imported to the project site shall be tested for toxicity. The applicant shall <br /> submit the results of such testing to the City. Fill material which has toxicity levels in excess of permissible <br /> local, state or federal levels shall not be used on the project site. <br /> (p) All metal fences and ancillary structures in the right -of -way and in close proximity to the <br /> transmission lines shall be grounded, in accordance with applicable specifications, to eliminate potential <br /> electric shocks. Appropriate cautionary signing shall also be installed. <br /> CITY OF SAN LEANDRO, a municipal <br /> corporation <br /> Dated: ..2 � /o o By: <br /> OHN J. JERMANIS <br /> City Manager <br /> RYLAND HOMES OF CALIFORNIA, INC., a <br /> Delaware corporation, Owner(s) <br /> 154 N .__ <br /> Dated: fars � aooe By: <br /> Signature <br /> CL ec- 6A-L <br /> 1�/� Print name <br /> /Ls ra,r VICe REESS/palr <br /> Title <br /> TRACT MAP 7092 MEDALLION PHASE 2 <br /> SUBDIVISION IMPROVEMENT AGREEMENT (PRIVATE IMPROVEMENT) <br /> C:\MAPS \TM7092\SUBIM P2.AG R.DOC <br /> PAGE 16 OF 17 <br />