My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2001 CJW Architecture (3)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2001
>
Agmt 2001 CJW Architecture (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2010 4:44:42 PM
Creation date
8/31/2010 4:44:18 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
2/5/2001
Retention
PERM
Document Relationships
Reso 2001-010
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />2. Deliverables will include: <br />• Architectural site plan <br />• Floor plans <br />• Elevations, Interior and Exterior <br />• Typical building sections <br />• Typical wall sections <br />• Preliminary schedules <br />• Typical door and window details and schedules <br />• Typical details <br />• DD civil drawings <br />• DD site plans for mechanical, plumbing, fire protection,. landscape, and <br />electrical <br />• DD structural, mechanical, plumbing, fire protection, landscape, and electrical <br />floor plans <br />• DD furniture and. interior design plan, and schedules. <br />• Master specifications <br />• DD detailed cost estimate <br />• One set of reproducible vellums <br />3. Meetings will include: <br />• Design development review (1) <br />C. Construction Documents <br />1. Construction documents will be based on the design development documents, <br />response to design development review comments, and updated budget. <br />2. Deliverables will include: <br />• Drawings and specifications setting forth in detail the requirements for the <br />construction of the project, including final furnishings and equipment <br />selection and structural and energy calculations required by the local building <br />authority <br />• Building Department approval of submitted items (building department <br />submittal is included in scope of work) <br />• Structural, mechanical, plumbing, fire protection, landscape, and electrical <br />drawings and specifications <br />• Technical specifications, including City of San Leandro's bidding and <br />procurement information, bidding and proposal forms, form of agreement and <br />the condition of the contract for construction <br />• One set of mylar drawings <br />• One set of prints <br />• 3.5" or ZIP diskettes with complete files for all drawings, in AutoCad Ver. 14- <br />compatible format <br />• One bound copy and one unbound copy of the specifications <br />Exhibit A <br />6/12/95 <br />Page 3 of 5 <br />Fire Station/Williams <br />
The URL can be used to link to this page
Your browser does not support the video tag.