My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2001 CJW Architecture (3)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2001
>
Agmt 2001 CJW Architecture (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2010 4:44:42 PM
Creation date
8/31/2010 4:44:18 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
2/5/2001
Retention
PERM
Document Relationships
Reso 2001-010
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />a <br />IV. Scope of Services <br />A. Schematic Design (SD) <br />1. Refine prototype site design by locating all site elements and verifying the <br />adequacy of the drive widths, turning radii, pedestrian access and circulation. <br />2. Review floor plan to confirm compliance with ADA requirements and make <br />minor changes to building plan. <br />3. Provide civil, structural, mechanical, plumbing, & electrical schematic system <br />overlays. <br />4. Deliverable documents, will include: <br />• Building and site code data <br />• Architectural site plan <br />• Site plan with preliminary civil engineering <br />• Landscape plan <br />• Finalized floor plan <br />• Elevations <br />• Site overlays for mechanical, plumbing, fire protection, landscape, and <br />electrical <br />• Plan overlays for structural, mechanical, plumbing, fire protection, landscape, <br />and electrical <br />• Building sketches <br />• Schematic construction cost estimate <br />• City Council presentation documents <br />• Planning Commission presentation documents <br />• Planning Department submittal as required <br />• Revised documents addressing comments <br />• One set of reproducible vellums <br />• One set of full size prints and one set of reduced prints <br />6. Cost estimate <br />7. Meetings will include: <br />• SD Progress Meeting (1) <br />• SD Review Meeting (1) <br />B. Design Development (DD) <br />1. Design development will be based on the approved schematic design package and <br />budget. Documents will fix and describe the size and character of the project as to <br />architectural, furniture, finishes, colors, structural, mechanical, plumbing, <br />landscape, and electrical system. <br />Exhibit A <br />6/ 12/95 <br />Page 2 of 5 <br />Fire Station/Williams <br />
The URL can be used to link to this page
Your browser does not support the video tag.