,.;;:4:ai.:mcz..�. az: BID SUMMARY
<br /> g la
<br /> 4:37ag,::_.:•,:::r•si.:w:)::5:4
<br /> • :::::„..‘,.:::/......::::vi { :_�,� ?;; bys;�_,,,.,,;;rrz,..,,, This document is a summary of bids received for the subject project and are provided
<br /> only as a convenience. Listing of a particular bid is not a finding thatsuch bid has
<br /> been found to be responsive or accepted as complete by the City. An award of
<br /> • contract, if any, is subject to approval of the City Council andlor the City Manager.
<br /> -
<br /> Contractors should refer to the contract documents for bidding information.
<br /> •
<br /> PROJECT TITLE: 2009 Sanitary Sewer Pipeline Replacements Project
<br /> -
<br /> PROJECT NO.: 09493
<br /> BID NO.: NIA
<br /> BID OPENING • ENGINEER'S ESTIMATE Andes Construction. Inca O'Arcy 8 Harty Construction, Inc. Ranger Pipelines, Inc.
<br /> DATE: Tuesday, July 13, 2010 Date Approved: 3/1612010 5305 E. 12111 Street 1300 Carroll Avenue P, 0. Box 24109
<br /> TIME: 3:00 PM Prepared by: JO Oakland, CA 94601 • San Francisco, CA 94124 '- San Francisco, CA 94124
<br /> LOCATION: City Clerk Phone: 510-536-7832 Phone: 415-822-5200 Phone: 415 - 822 -3700
<br /> Far. 510.536 -7834 Fax: 415-822-0747 Fax: 415-822 -3703
<br /> ITEM'
<br /> NO. QUANTITY ITEM UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST rTEM COST UNIT COST ITEM COST
<br /> 16 335 LF C PVC C900 Pipelin by Open 5110.00 536,850.00 378.00 526,13000 3195.00 565,325.00 5150.00 550,250.00
<br /> Trench
<br /> 17 385 LF 8' HDPE by Horizontal 5210.00 580 850.00 5120.00 546.200.00 5250.00 596250.00 5250.00 596,250.00
<br /> Directional Dolling
<br /> 18 240 LF 8' HDPE by Pipe Bursting 5130.00 531.200.00 591.00 521040.00 5200.00 548,000.00 5100.00 524.000.00
<br /> 19 60 LF Point Repairs 5200.00 512,000.00 5225.00 513,500.00 5480.00 528,800.00 5750.00 545,000.00
<br /> 20 18 EA Sewer Lateral Reconnection by 52, 000.00 536,000.00 52,800.00 550,400.00 5350.00 $6.300.00 51,000.00 518.000.00
<br /> open Trench
<br /> 21 42 EA Internal Sewer Lateral 5500.00 521000.00 5750.00 531,500.00 5200.00 58, 5155.00 56,510.00
<br /> Reconnection (CIPP)
<br /> 22 41 EA Internal Sewer Lateral 52,000.00 582,000.00 51,600.00 565 51,750.00 571,750.00 52,075.00 585,075.00
<br /> Reconnection wkh top Hats
<br /> (CIPP) •
<br /> •
<br /> 23 1 EA Access Ladder 51,500.00 51,500.00 51,800.00 51,800.00 54,000.00 54,000.00 57,400.00 57,400.00
<br /> 24 1 LS Sheeting/ShoringlBraring 520,000.00 520.000.00 515,000.00 515,000.00 529,000.00 529,000.00 530,000.00 530.000.00
<br /> 25 9 EA Sewer lateral Cleanout 5400.00 _ 53,600.00 5500.00 54,500.00 51,200.00 510,800.00 5400.00 53,600.00
<br /> TOTAL BASE BID: 51,006,620.00 5707,575.00 5986,740.00 . 5998,580.00
<br /> SUBCONTRACTORS: Bay Line it Core, Irving Trucking, Northern Directional Drill, Pacific Boring
<br /> Southwest Pipeline Southwest Pipeline, Christian
<br /> Brothers Lining -
<br /> SECURITES: 10% Bid Bond 10% Bid Bond 10% Bid Bond •
<br /> NOTES:
<br /> • Reviewed by:. �1 ►'� n �i -r Date: 7 I 1 3 G 0
<br /> John nscou, Project Manager
<br /> Reviewed by: 4,74-.---- • Date: lj
<br /> . Austi Osakwe, Senior Engineer r !!! .
<br /> •
<br /> 94 Summary -2009 Sanitary Pipeline Replacements Project4dsx Pepe 2 et 2 Printed 711372010 @ 4:42 Pei