Laserfiche WebLink
EXHIBIT B -1 <br /> FEE SCHEDULE <br /> 3.1 Investigation <br /> 3.1.1 Project initiation $1,080 <br /> 3.1.2 Cooling and heating load analysis 1,600 <br /> 3.1.3 Review record data 1.600 <br /> 3.1.4 Interviews with PSB occupants 1,620 <br /> 3.1.5 Interviews with engineering and maintenance staff 540 <br /> 3.1.6 Investigation and observation 4,000 <br /> 3.1.7 Report of findings 1,600 <br /> Subtotal Investigation Phase 512,940 <br /> 3.2 Review the Possible Approaches <br /> 3.2.1 Review minor alteration approaches $ 810 <br /> 3.2.2 Review ideal approaches 810 <br /> 3.2.3 Review minor relocations approach (included in 3.2.2) <br /> 3.2.4 Cost estimates 1,600 <br /> 3.2.5 30% draft report 1,600 <br /> 3.2.6 70% draft report 1.600 <br /> 3.2.7 DOE -2 energy simulations (optional task at City direction) 4,000 <br /> 3.2.8 Draft final report 2,400 <br /> 32.9 Exhibits 2,400 <br /> Subtotal Review and Reporting Phase $12,040 <br /> Reimbursables (Exhibit B -2) 10,840 <br /> Subtotal Less Reimbursables $15.220 <br /> TOTAL THIS AGREEMENT NOT TO EXCEED S38,100 <br /> Exhibit 13 -1 Page 1 of 1 <br /> 6/12/95 TAYLOR/Public Safety Building 11VAC System Rehab <br />