My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2000 Taylor Engineering LLC
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2000
>
Agmt 2000 Taylor Engineering LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2010 4:52:50 PM
Creation date
9/4/2010 4:52:48 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/6/2000
Retention
PERM
Document Relationships
Reso 2000-031
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF SERVICES <br /> PROFESSIONAL SERVICES FOR <br /> PUBLIC SAFETY BUILDING HEATING, VENTILATING, AND AIR CONDITIONING <br /> SYSTEM REHABILITATION <br /> PROJECT SUMMARY <br /> This Agreement is for the investigation, inspection, preparation of design alternatives for <br /> recommendations to provide the City of San Leandro with direction to allow the <br /> improvement and/or replacement of the heating, ventilating, and air conditioning systems <br /> within City of San Leandro's Public Safety Building (PSB). The intent of the work <br /> included in this agreement is to provide detailed design approaches for the system <br /> rehabilitation alternatives that are presented by the Contractor. The detailed design <br /> approaches shall include sufficient information to allow the preparation of the subsequent <br /> construction documents without further study of the facility. <br /> All work shall be in accordance with all applicable codes and standards. <br /> 2. PROJECT INFORMATION <br /> 2.1 PROJECT LOCATION <br /> The project site is the City of San Leandro's Public Safety Building (Police <br /> Department) located at 901 East 14th Street, San Leandro, within the Civic Center <br /> complex. The building is a three -story structure containing all departments of the <br /> Police Department including but not limited to, Records, Investigation, Traffic, <br /> Evidence, Administration, indoor gun firing range, and detention facility (jail). <br /> The building is an essential services facility operating 24 hours a day, 365 days a <br /> year. The Contractor shall not, at any time, make contact with the Public Safety <br /> Building or its occupants without the express authorization of the Project <br /> Manager. <br /> 2.2 EXISTING CONDITIONS (Public Safety Building Overview) <br /> The City of San Leandro's Public Safety Building is a three story essential <br /> services building housing the City's Police Department that also includes an <br /> indoor gun firing range, and a 10 -cell jail. The building and the original <br /> mechanical system were constructed in the late 1960s. The heating, ventilating <br /> and air conditioning (I -1VAC) system consisted of a central heating and cooling <br /> plant to provide chilled and hot water to three air handling systems. The jail and <br /> gun firing range where supplied with 100% outside air with heating capacity only. <br /> Exhibit A Page 1 of 5 <br /> 6/12/95 TAYLOR/Public Safety Building IIVAC System Rehab <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.