My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2000 Taylor Engineering LLC
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2000
>
Agmt 2000 Taylor Engineering LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2010 4:52:50 PM
Creation date
9/4/2010 4:52:48 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/6/2000
Retention
PERM
Document Relationships
Reso 2000-031
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor, the City standard title block and copies of record drawings <br /> including electronic files of such drawings as may be available. <br /> All plans, renderings, sketches etc. shall be professionally prepared and be <br /> clear, legible, of industry standard scales, and easily reproducible by <br /> standard reproduction equipment. Contractor shall submit one original <br /> hard copy and one electronic copy of all drawings to the City. <br /> 4.1.2 Written documents and reports shall be provided to the City via electronic <br /> mail or on media acceptable to the City of San Leandro in Microsoft Word <br /> 97 for Windows file format. <br /> All specifications shall be professionally prepared and be clear, legible, <br /> and easily reproducible by standard reproduction equipment. One hard <br /> copy original and one electronic copy of the final bid documents shall be <br /> submitted to the City for reproduction by the City. <br /> 4.1.3 All information, plans, sketches, renderings, displays, reports, <br /> photographs, specifications, electronic files, etc. prepared under this <br /> Agreement shall become the property of the City to reproduce, distribute, <br /> modify and use in any way the City deems necessary with no <br /> compensation provided other than that provided by this agreement <br /> between the City and Contractor. <br /> 5. PROJECT SCHEDULE <br /> Weeks from <br /> Milestone Notice to Proceed <br /> Notice to Proceed <br /> Project Kick -off Meeting one (I) <br /> Complete Investigation/Inspection three (3) <br /> Submit Final Condition Report/Study /Recommendations six (6) <br /> Exhibit A Page 5 of 5 <br /> 6/12/95 TAYLOR/Public Safety Building IIVAC System Rehab <br />
The URL can be used to link to this page
Your browser does not support the video tag.