My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2000-056
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2000
>
Reso 2000-056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2010 4:12:06 PM
Creation date
9/7/2010 4:06:29 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
4/17/2000
Retention
PERM
Document Relationships
Agmt 2000 SCS Development Co
(Approved)
Path:
\City Clerk\City Council\Agreements\2000
Agmt 2000 SCS Development Co (2)
(Approved)
Path:
\City Clerk\City Council\Agreements\2000
Inst 2000121621
(Approved)
Path:
\City Clerk\City Council\Recorded Documents\2000
Inst 2000137790
(Approved)
Path:
\City Clerk\City Council\Recorded Documents\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Prior to the issuance of building permits for the first phase of the project, the Subdivider <br /> shall pay the entire underground utility conversion fees, or enter into an Underground <br /> Utility Agreement in accordance with the provisions of the City Underground Utilities <br /> District Master Plan. <br /> 3. Prior to approval of the first Final Map, the Subdivider shall provide written evidence <br /> form utility companies that satisfactory arrangements, including necessary payments, <br /> have been made to ensure undergrounding or removal of existing overhead utility lines <br /> through the site. The Subdivider shall place all utility services for the project <br /> underground. including any service connections to the existing overhead utilities. <br /> H. FEES AND DEPOSITS <br /> 1. Design review fees, development impact fees,.permit fees, inspection fees, and any other <br /> fees charged by the City or other reviewing agencies for the review, approval, permitting <br /> and inspection of the above listed public improvements shall be paid by the Subdivider. <br /> 2. Prior to approval of each Final Map, Subdivider shall enter into a Subdivision Improvement <br /> Agreement for that Final Map and shall post security and insurance in the amounts and <br /> forms acceptable to the City Engineer. <br /> 3. Prior to approval of the first Final Map, Subdivider shall pay Development Fee for Street <br /> Improvement (DFSI) as determined by the City Transportation Administrator. <br /> I. PRIVATE IMPROVEMENTS <br /> 1. All of the sanitary sewer and storm drainage facilities constructed within the boundaries of <br /> the project shall be privately owned and maintained by the project Homeowners' <br /> Association. unless otherwise rioted on the approved improvement plans, up to the point of <br /> connection of the systems to an existing public facility. <br /> 2. All proposed improvements on Alvarado Street, northwesterly of and including the <br /> proposed bridge. and all of the streets and services within the project boundary shall be <br /> privately maintained, with the exception of the existing sanitary sewer and storm drain <br /> mains that shall remain within the project. Access to these existing and rerouted public <br /> storm drain and sanitary sewer systems must be maintained via public utility easements and <br /> access doors through the soundwalls along the project perimeter if necessary. <br /> J. MINI PARKS, LANDSCAPING AND PERIMETER WALLS <br /> I. The Subdivider shall provide and construct parks in accordance with the standards of <br /> Section 7 -1 -800, et seq., San Leandro Municipal Code and as required by the Park & <br /> Recreation Commission. All such parks shall be owned and maintained by the Subdivider <br /> or the project Homeowners' Association. <br /> Cherry City Vesting TM 7078 <br /> 2/9/99 Page 8 of 9 <br /> 134 <br />
The URL can be used to link to this page
Your browser does not support the video tag.