Laserfiche WebLink
5. Work; Time for Commencement and Performance. City hereby fixes the time for the <br /> commencement of the required work to be on or about the 6th day of June, 2000, and for its completion to <br /> be on or before the 5th day of June, 2001. At least 15 calendar days prior to the commencement of work <br /> hereunder, Subdivider shall notify the City Engineer in writing of the date fixed by Subdivider for <br /> commencement thereof, in order that the City Engineer shall be able to provide services for inspection. <br /> 6. Location of Construction Yard: Subdivider agrees to locate any construction yard for the storage <br /> of equipment, vehicles, supplies and materials, or the preparation or fabrication thereof, to be used in <br /> connection with the installation of improvements for said subdivision or the construction of buildings <br /> therein, in such a manner so as to cause a minimum of inconvenience to persons living in the areas <br /> immediately adjacent to said subdivision, including installation of appropriate fencing and screening and to <br /> obtain the approval of the City Engineer as to the proposed location and standards for maintenance of the <br /> yard. Immediately upon completion of the last building to be constructed in the subdivision, or unit thereof, <br /> to which this agreement refers, Subdivider agrees to cease using the construction yard clear the site and <br /> restore it to its original condition, and to remove therefrom all supplies, materials, equipment, or vehicles <br /> being stored or kept thereon. Subdivider agrees not to use the construction yard in connection with the <br /> installation of improvements or construction of buildings in any other subdivision, or any other unit of the <br /> subdivision to which this agreement refers. City may extend the time within which the construction yard <br /> may be used or within which supplies, materials, equipment or vehicles may be stored or kept thereon if City <br /> shall determine that the granting of such extension will not be detrimental to the public welfare. No <br /> extension will be made except on the basis of a written application made by Subdivider to the City Engineer <br /> stating fully the grounds and facts relied upon for such extension. <br /> 7. Rights -of -Way Free From Obstruction Subdivider agrees to keep and maintain all areas within <br /> the improved or partially improved public streets or public rights -of -way contiguous and adjacent to and <br /> within the herein above referred to Subdivision, including streets being constructed and/or improved <br /> pursuant to this agreement, free and clear of all building materials, dirt, mud, sand, gravel, rocks, bricks, <br /> TRACT MAP 7183 <br /> SUBDIVISION IMPROVE M ENT AGREEMENT (PUBLIC IMPROVF,MF.NT) <br /> F:\7 M \TM7183 \SUBIMP I .AGR <br /> PAGE 3 OF 16 <br />