Laserfiche WebLink
C. Landscape Architect <br /> 1.6.2 Allotment of three team meetings with design consultants to <br /> exchange and coordinate information. Meetings to be held <br /> at Architect's office. Provide base sheet information to non - <br /> architectural design consultants as required. <br /> 1.6.3 Phone and fax communications <br /> 1.7 Response to City's Plan Check Comments <br /> 1.7.1 Respond to City's plan check comments and resubmit revised <br /> plans for building permit (limited to two re- submittals). <br /> 1.8 REPRODUCEABLE BUDGET (FOR ALL THREE CENTERS) <br /> 1.8.1 Permit submittal drawings (6 sets) <br /> 1.8.2 Re- submittal after City plan check (6 sets) <br /> 1.8.3 Internal plan checking (6 sets) <br /> 1.8.4 Miscellaneous facsimiles and mailing expenses <br /> 1.8.5 Budget $ 2,550 <br /> 1.9 TIME ALLOCATION AND BUDGET <br /> 1.9.1 Rexall /Porteri\9arket Center <br /> A. Architectural fee <br /> B. Landscape fee <br /> C. Electrical fee <br /> D. Structural fee <br /> E. Reproduceable budget <br /> F. Subtotal $28,000 <br /> 1.9.2 Manor Shopping Center <br /> A. Architectural fee $13,000 <br /> B. Landscape fee $ 3,400 <br /> C. Electrical fee $ 3,800 <br /> D. Structural fee $ 4,800 <br /> E. Reproduceable budget $ 850 <br /> F. Subtotal $25,850 <br /> 1.9.3 Economy Market Center <br /> A. Architectural fee $10,000 <br /> 13. Landscape fee $ 3,200 <br /> C. Electrical fee $ 3,000 <br /> D. Structural fee $ 1,500 <br /> E. Reproduceable budget $ 850 <br /> F. Subtotal $18,550 <br /> 1.9.4 Total (maximum not to exceed budget) $72,400 <br /> EXHIBIT A Page 9 of 11 <br /> AGRE\E\HIBITA.DOC (Word 6.0) <br />