My WebLink
|
Help
|
About
|
Sign Out
Home
8B Consent 2010 1004
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2010
>
Packet 2010 1004
>
8B Consent 2010 1004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2010 1:47:10 PM
Creation date
9/30/2010 4:16:34 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
10/4/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 1004
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 1004
Reso 2010-129
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r ESA <br /> SECTION E <br /> Work Products and Budget <br /> 1. Project Understanding and Approach <br /> The central mission of the City of San Leandro Harbor Basin Alternatives <br /> Study can be stated in a straightforward way: First. to provide alternative <br /> configurations for the Harbor Basin which retain aquatic recreational <br /> opportunities but which will be in equilibrium with natural sedimentation <br /> =`' processes; and second, to consider options for the DMMS as an expanded <br /> r ;'^ and improved natural habitat which also can be a City amenity. <br /> ..i. =j,e. <br /> ° ice 2. Work Product Organization <br /> Section C described the team's process for generating the alternatives. As <br /> this collaborative process moves forward, thc team will produce technical <br /> memoranda that capture each team member's input. These technical <br /> memoranda will form the subsections to the final report, but the initial <br /> products to be submitted to the City will be the descriptions of the <br /> Alternatives with the initial assessments of each team member. In this <br /> manner, the ESA team will have City feedback early in the process and help <br /> in reducing thc initial five alternatives to the two or three design concepts. <br /> Task 1. Team Meeting Reports for Harbor Basin <br /> Alternatives <br /> We will have three formal group brainstorming meetings, one each in <br /> October, November and December. <br /> Deliverable: Within two weeks of the meeting date, ESA will provide <br /> the City with a preliminary representation of thc alternative proposed, <br /> including initial responses from all team members under the following <br /> headings: <br /> • Permitting and regulatory opportunities and constraints <br /> • Cost projections <br /> • Long -term maintenance projections <br /> • Potential revenues <br /> • Meteorological and hydrological patterns and constraints <br /> City of San Leandro Harbor Basin Alternatives Study RFP 50536 E -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.