Laserfiche WebLink
EXHIBIT A <br /> SCOPE OF SERVICES <br /> 2010 Building Management System Project <br /> The following description of bid items is provided to further describe several items contained in <br /> the proposal. It is not the intention of this summary to limit each only to those special work <br /> descriptions, but rather show that each item listed shall include everything required, whether <br /> specifically enumerated or not, to construct, install or provide, including profit and overhead, <br /> the complete item of work. <br /> The City's adopted standard for BMS is Johnson Controls. No substitutions or alternatives will <br /> be accepted. Contractor must be a certified for installation /service of Johnson Controls BMS. <br /> Manufacturers must meet the Buy American provision in section 1605 of the American <br /> Recovery and Reinvestment Act (ARRA) of 2009 per the U.S. Department of Energy. <br /> Prior to start of contract, Contractor shall obtain a DUNS number, which is required as part of <br /> the reporting requirements the City must complete for the ARRA. <br /> Part 1— General <br /> 1.1 Related Documents <br /> 1.2 Definitions <br /> 1.3 BMS System Description <br /> 1.4 Quality Assurance <br /> 1.5 References <br /> 1.6 Submittals <br /> 1.7 Record Documentation <br /> 1.8 Warranty <br /> Part 2 — Products <br /> 2.1 General Description <br /> 2.2 BMS Architecture <br /> 2.3 User Interface <br /> 2.4 Network Control Engine (NCE) <br /> 2.5 DDC System Controllers <br /> 2.6 Field Devices <br /> Part 3 — Execution <br /> 3.1 Installation Practices <br /> 3.2 Training <br /> Non - Professional Services Agreement between November 1, 2010 <br /> City of San Leandro and Martin Industries, Inc., DBA Climatech Page 1 of 28 <br />