My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2010 Martin Industries Inc dba Climatech
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2010
>
Agmt 2010 Martin Industries Inc dba Climatech
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2012 5:22:37 PM
Creation date
11/3/2010 9:52:47 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/1/2010
Retention
PERM
Document Relationships
Reso 2010-135
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d. Binary Outputs - shall output the following: <br /> 0 24 VAC Triac <br /> e. Configurable Outputs - shall be capable of the following: <br /> 0 Analog Output, Voltage Mode <br /> 0 Binary Output Mode <br /> 7. The 10M shall include troubleshooting LED indicators to identify the following <br /> conditions: <br /> a. Power On <br /> b. Power Off <br /> c. Download or Startup in progress, not ready for normal operation <br /> d. No Faults <br /> e. Device Fault <br /> f. Normal Data Transmission <br /> g. No Data Transmission <br /> Installation, Commissioning and Training <br /> 3.1 Installation Practices <br /> 1. All Line Voltage to be in conduit. <br /> 2. Low Voltage in Mechanical Rooms to be in conduit below 8 feet. <br /> 3. All exposed wire must be plenum rated. <br /> 4. All wiring and installation to be per City requirements. <br /> 3.2 Commissioning <br /> 1. All BMS and Lighting (where applicable) equipment installed by Contractor shall be <br /> commissioned, including functional testing of equipment operation and control <br /> systems, control hardware and software, sequence of operations, and integration of <br /> factory controls with BMS and the lighting control system's interface with day - <br /> lighting. <br /> 2. Contractor shall provide documentation of tests, procedures and installations. <br /> 3. During warranty phase (1- year), Contractor shall: <br /> a. Remedy any installation related deficiencies <br /> b. Maintain current record drawings and documentation to reflect any changes <br /> made <br /> 3.3 Training <br /> 1. Controls Contractor to supply two 4 -Hour onsite Training Sessions within 10 days of <br /> completion of project <br /> THE FOLLOWING SHALL APPLY TO ALL BID ITEMS <br /> Non - Professional Services Agreement between November 1, 2010 <br /> City of San Leandro and Martin Industries, Inc., DBA Climatech Page 26 of 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.