My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent 2010 1206
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2010
>
Packet 2010 1206
>
8D Consent 2010 1206
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2010 5:40:34 PM
Creation date
12/2/2010 4:02:32 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
12/6/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 1206
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 1206
Reso 2010-144
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN LEANI)RO <br /> APPROVED AND <br /> STAFF REPORT FORWARDED <br /> TO CITY COUNCIL, <br /> DATE: December 6, 2010 Steph�olliste r <br /> TO: Stephen L. Hollister, City Manager City Manager <br /> FROM: Uchenna Udemezue, Directo <br /> Engineering and Transportatiot <br /> BY: Kenneth Joseph, City Engine r <br /> Engineering and Transports on <br /> SUBJECT PROJECT / PRO.JECT DESCRIPTION: <br /> RESOLUTION APPROVING A CONSULTING SERVICES AGREEMENT WITH WALKER <br /> PARKING CONSULTANTS RELATED TO THE ESTUDILLO CALLAN 2008 PARKING <br /> GARAGE PROJECT, PROJECT NO. 08- 962 -86 -067. <br /> SUMMARY AND 12ECOiMMENDATION <br /> Staff recommends approval of a consulting services agreement with Walker Parking Consultants <br /> in the amount of $244.000 to provide professional construction support for the subject project. <br /> I3ACKCROUND <br /> The existing 2 -level parking garage was constructed in 1973. Since then, concerns with the <br /> existing structure developed, including: I) the insufficient number of parking spaces; 2) traffic <br /> circulation within the structure and entry /exit onto both Estudillo Avenue and Callan Avenue; 3) <br /> Americans with Disabilities Act (ADA) accessibility; 4) security; and 5) the structure's ability to <br /> withstand a significant seismic event. <br /> In 2008, Walker Parking Consultants was retained to design a replacement parking structure to <br /> address all of the deficiencies noted. The design included: 1) a 4- or 5 -story parking structure; <br /> 2) exterior colors and materials to complement the architecture of the Main Library; and 3) a <br /> 2.000- square foot office space for the Chamber of Commerce fronting Estudillo Avenue. The <br /> building is Leadership in Energy and Environmental Design (LEED) registered and a Silver <br /> certification level appears achievable. In addition to the structure, the Plaza Del Oro will be <br /> upgraded to match the improvements recently completed on the west side of East 14`" Street. <br /> The City Council approved the project plans and awarded a contract for the construction of a 4- <br /> story parking structure to Webcor Construction. The new structure will provide 395 parking <br /> spaces and will be an open structure to promote security and provide an inviting image to users. <br />
The URL can be used to link to this page
Your browser does not support the video tag.