My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2010 Applied Materials & Engineering Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2010
>
Agmt 2010 Applied Materials & Engineering Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2012 5:22:38 PM
Creation date
12/13/2010 5:19:08 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
12/6/2010
Retention
PERM
Document Relationships
Reso 2010-145
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a yip _ Af°PPLOC DD MATEROALO ENOONEER0019, OU©e <br /> 980 41g Street Tel: (510) 420 -8190 <br /> Oakland, CA 94608 FAX (510) 420 -8186 <br /> e -mail: info @appmateng:com <br /> ESTUDILLO CALLAN 2008 PARKING GARAGE <br /> SAN LEANDRO, CA <br /> C. SOILS & ASPHALT TESTING & INSPECTION FEES <br /> SUMMARY OF FEES <br /> 1 Building Pad 5 2,280.00 <br /> 2 Concrete Sidewalk 5,200.00 <br /> 3 Utility Trenches and Other Areas 2,280.00 <br /> 4 In -fill, Masonry Wall @ C 1,640.00 <br /> 5 Paving Improvements 2,925.00 <br /> 6 Mileage (allowance) 126.00 <br /> TOTAL S 14,451.00 <br /> DETAILED FEES <br /> 1 Building Pad <br /> Basis: We will provide Nuclear Density Testing as required for the Building Pad and related work. <br /> We are budgeting field compaction testing hours as follows: <br /> Building Pad 6. 4 hour trips: 24 hours <br /> a) Building pad 24 hours @ S80.00 per hour 1.920.00 <br /> b) Proctors 1 test n S360.00 per test 360.00 <br /> Sub -Tota 5 2,280.00 <br /> 2 Concrete Sidewalk <br /> Basis: We will provide Nuclear Density Testing as required for the sub -grade and base rock. In <br /> addition, we will inspect and test the concrete placement. We are budgeting field <br /> compaction testing and concrete placement inspection hours as follows: <br /> Sub - Grade & Base Rock 8, 4 hour trips: 32 hours <br /> Concrete Palcements 4. 4 hour trips: 16 hours <br /> a) Backfill and Site Grading 32 hours @ S80.00 per hour 2,560.00 <br /> b) Proctors 2 tests @ 5360.00 per test 720.00 <br /> c) Concrete Placement 16 hours @ 580.00 per hour 1,280.00 <br /> d) Cylinder tests 4 sets @ $160.00 per set 640.00 <br /> Sub -Tota 5 5,200.00 <br /> 3 Utility Trenches and Other Areas <br /> Basis: We will provide Nuclear Density Testing as required for utility trenches and related work. <br /> We are budgeting field compaction testing hours as follows: <br /> Utility Trenches 6. 4 hour trips: 24 hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.