Laserfiche WebLink
VIII. ENVIRONMENTAI, SERVICES REQUIREMENTS <br /> A. The mopped -tar roof material indicated for the trash enclosure shall be changed to <br /> a more environmentally friendly material, indicated on the plans at the time of <br /> submittal for building permits. Similarly, mopped -tar roof material may not be <br /> used for the new restaurant building. <br /> B. The applicant and /or contractor shall comply with the City's Construction and <br /> Demolition Ordinance for job site recycling during the demolition/construction <br /> phases, to the satisfaction of the Environmental Services Manager. <br /> C. On -site refuse enclosures for the restaurant building shall be of adequate size to <br /> accommodate a solid waste container and a recycling container (minimum 10' x <br /> 12' dimensions). The enclosure shall be easily accessible to collection vehicles <br /> and personnel. A concrete slab (minimum 6- inches thick) shall be constructed in <br /> front of the enclosure door to prevent damage to the asphalt from bin impact. The <br /> slab shall be size appropriately to accommodate a bin (approximately 4' x 8'). <br /> IX. CONSTRUCTION PROVISIONS <br /> A. Construction on the project site shall not commence prior to 7:00 a.m. and shall <br /> cease by 7:00 p.m., Monday through Friday, and prior to 8 a.m. and shall cease by <br /> 7 p.m. Saturday and Sunday, unless otherwise approved by the Chief Building <br /> Official. There shall be no construction on Federal holidays. Interior <br /> construction such as sheet rock taping and texturing, painting, tile installation and <br /> similar activity shall be permitted outside the above hours provided that <br /> construction noise shall not be detectable outside of the structures being built. <br /> B. Construction activity shall not create dust, noise or safety hazards for adjacent <br /> residents and properties. Dirt and mud shall not be tracked onto Hesperian <br /> Boulevard or Lewelling Boulevard from the project site during construction. <br /> C. Standard construction dust control procedures, such as wetting, daily roadwashing <br /> and other maintenance functions to control emissions, shall be implemented at all <br /> times during outdoor construction. Dust generating activities such as grading, <br /> excavation, paving etc., shall be scheduled the early morning and other hours <br /> when wind speeds are low. All constriction activities entailing soil disturbance <br /> shall cease when winds exceed 30 miles per hour as an hourly average. <br /> D. The applicant shall prepare a construction truck route plan that would restrict <br /> trucks to arterial streets that have sufficient pavement section to bear the heavy <br /> truck traffic, thereby minimizing noise and traffic impacts to the community. The <br /> construction truck route plan shall be reviewed and approved by the City <br /> Engineering and Transportation Department prior to receipt of the grading permit. <br /> E. Truck hauling activities shall be restricted to 8:00 a.m. to 5:00 p.m., unless <br /> otherwise approved by the City Engineer. There shall be no truck hauling activity <br /> on Saturdays, Sundays and Federal holidays. <br /> Amended Conditions or Approval November 3, 2010 <br /> PLN2005-001 12 Page 8 of 10 <br />