My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2011 Ninyo & Moore
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2011
>
Agmt 2011 Ninyo & Moore
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2011 12:11:45 PM
Creation date
1/21/2011 12:11:43 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
1/18/2011
Retention
PERM
Document Relationships
Reso 2011-006
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will be surveyed by a Califomia licensed surveyor. The groundwater monitoring wells coordinates <br /> will be uploaded to the Regional Water Quality Control Board (RWQCB) Geotracker database. <br /> Subtask 2.4: Environmental Laboratory Analysis <br /> Groundwater samples will be transported via courier to a State certified analytical laboratory. The <br /> four groundwater samples, one from each well, will be analyzed for TPH-g, TPH-d, TPH -mo using <br /> EPA Method 8015M/8021; and benzene, toluene, ethylbenzene and total xylenes (BTEX), and <br /> methyl tert -butyl ether (MTBE) using EPA Method 8260B. <br /> Subtask 2.5: Groundwater Monitoring Well Installation & First Quarter Groundwater Monitoring <br /> Event Report, Geotracker Upload <br /> A Groundwater Monitoring Well Installation and First Quarter Groundwater Monitoring Event report <br /> will be prepared upon completion of the field activities and receipt of laboratory analyses. The <br /> report will summarize the results of the field work and include tables of soil and groundwater <br /> analytical laboratory results, and present figures showing the distribution and constituent <br /> concentrations in soil and groundwater. The report will present findings, conclusions, and <br /> recommendations. An electronic copy of the report will be submitted to the RWQCB's Geotracker <br /> database. <br /> Deliverables <br /> o Final Groundwater Monitoring Well Installation Report <br /> o First Quarter Groundwater Monitoring Report <br /> Task 3 — Three Quarters of Groundwater Monitoring <br /> Three quarterly groundwater monitoring events (second through fourth quarters) will be performed per <br /> County Guidelines. The scope of work associated and to be performed by the Consultant is the following: <br /> Subtask 3.1: Project Coordination <br /> Project set -up, reviewing contractor bids, review local groundwater data, and meeting with the City <br /> and regulatory agency. <br /> Subtask 3.2: Three Quarters of Groundwater Monitoring <br /> During each sampling event, the depth to groundwater will be measured using a water level meter, <br /> and groundwater, parameters including pH, temperature, and conductivity will be measured. <br /> Groundwater samples will be collected from each monitoring well in the appropriate laboratory <br /> supplied containers and transported to a state - certified laboratory for analysis. <br /> Subtask 3.3: Environmental Laboratory Analysis <br /> The groundwater samples will be analyzed for TPH-g, TPH-d, and TPD -mo using EPA Method <br /> 8015B/8021, BTEX and MTBE using EPA Method 8260B. <br /> Subtask 14: Reporting and GeoTracker Upload <br /> Field and laboratory data will be incorporated into Second, Third and Fourth Quarter Groundwater <br /> Monitoring Reports which will include copies of field data sheets, data tables summarizing <br /> analytical results, and figures. The Quarterly Groundwater Monitoring Reports will be submitted to <br /> Consulting Services Agreement between 14901 East 14th Street Site Remediation <br /> City of San Leandro and Ninyo & Moore — Exhibit A Page 18 of 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.