Laserfiche WebLink
EXHIBIT A <br /> SCOPE OF SERVICES <br /> HVAC Replacement at South Offices Project <br /> Bid No. 10- 11.015 <br /> The following description of bid items is provided to further describe several items contained in <br /> the proposal. It is not the intention of this summary to limit each only to those special work <br /> descriptions, but rather show that each item listed shall include everything required, whether <br /> specifically enumerated or not, to construct, install or provide, including profit and overhead, <br /> the complete item of work. <br /> • Furnish building plans set suitable for issuance of a City building permit within 30 days of <br /> Notice to Proceed. Plans to include all necessary work including but not limited to electrical, <br /> mechanical, plumbing, curb structure analysis and any modifications that may be required <br /> to get issuance of a building permit. <br /> • Disconnect, remove and dispose of two (2) existing rooftop gas pack units (dispose of in <br /> accordance with all local, county, state and federal laws and regulations). <br /> • Furnish and install four (4) new high efficiency 5-ton rooftop gas pack units of similar design, <br /> and install one (1) ductless split system heat pump with two evaporative coils in different <br /> offices. The replacement unit for the theater shall be placed on the theater roof, in the <br /> location determined by City staff. The other three units shall be placed within the existing <br /> mechanical screen area on the South Office roof. Sleepers to be minimum 18 inches <br /> (contractor to raise existing or install new to meet this specification). Furnish and install <br /> new curbs for the new units and set in place. <br /> • Furnish and install ductwork as needed to connect the new units to the existing ductwork. <br /> The zones have been determined by City staff. <br /> • Furnish and install new electrical disconnect and fuses. <br /> • Furnish and install thermostats for unit operation in the new zones. <br /> Centrels, NOT INCLUDED IN THIS AGREEMENT. <br /> • Furnish and install refrigerant piping between the indoor and outdoor units of the ductless <br /> split systems. <br /> Non - Professional Services Agreement between February 7, 2011 <br /> City of San Leandro and Kinetics Mechanical Service, Inc. (KMS) Exhibit A; Page 1 of 2 <br />