My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2011-069
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2011
>
Reso 2011-069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2011 10:19:28 AM
Creation date
4/11/2011 10:18:08 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
4/4/2011
Retention
PERM
Document Relationships
8J Consent 2011 0404
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0404
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LSA ASSOCIATES. INC. CEQA INITIAL STUDY/LITIGATED NEGATIVE DECLARATION <br /> MARCH IPll PREDA STREET PIPE BRIDGES UPGRADE <br /> SAN LEANDRO. CALIFORNIA <br /> MITIGATED NEGATIVE DECLARATION <br /> Project Name. Preda Street Pipe Bridges Upgrade <br /> Project Location. The project site is located at an existing sewer pipe crossing over San Leandro <br /> Creek adjacent to Alder Creek Circle, near Preda Street, in the City of San Leandro. <br /> Description of Project. The City of San Leandro proposes to replace two existing sewer pipes and <br /> rehabilitate two supporting pipe bridges that span San Leandro Creek, to maintain flow capacity and <br /> improve pipe performance during future seismic and/or flood events. Proposed activities involve the <br /> following: removal of existing pipes, excavation associated with installation of pipe restraints, <br /> upgrades to the existing support bridges and installation of new infrastructure including new pipes <br /> and pipe restraints. Several potential pipe replacement alternatives were evaluated by the City of San <br /> Leandro. The proposed project was determined based on factors including cost, durability. <br /> maintenance, and minimizing environmental impacts. Based on the results of these evaluations, the <br /> City of San Leandro has elected to replace the existing bell- and - spigot ductile iron sewer pipes with <br /> new ductile iron, restrained joint pipes that can accommodate the anticipated displacement of the <br /> pipelines for all design criteria. <br /> Findings. It is hereby determined that, based on the information contained in the attached Initial <br /> Study, the Project will not have a significant adverse effect on the environment. <br /> Mitigation measures necessary to avoid the potentially significant effects on the environment are <br /> included in the attached Initial Study, which is hereby incorporated in this Mitigated Negative <br /> Declaration. The City of San Leandro Community Development Department has agreed to implement <br /> each of the identified mitigation measures, which would be adopted as part of the Mitigation <br /> Monitoring and Reporting Program. <br /> Date: By: <br /> Phil Millenbah, Senior Planner <br /> San Leandro Community Development Dpt. <br /> P:\ EGI080110EQA \Preda_FINAL_IS- MNDdoc (03/28/11) <br />
The URL can be used to link to this page
Your browser does not support the video tag.