My WebLink
|
Help
|
About
|
Sign Out
Home
8I Consent 2011 0418
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0418
>
8I Consent 2011 0418
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2011 1:05:10 PM
Creation date
4/14/2011 5:43:32 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
4/18/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0418
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0418
Reso 2011-077
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN LEANDRO <br /> APPROVED AND <br /> STAFF REPORT FORWARDED <br /> TO CITY COUNCIL <br /> DATE: April 18, 2011 Step yen L. Hollister <br /> TO: Stephen L. Hollister, City Manag r City Manager <br /> FROM: Uchenna Udemezue, Director <br /> Engineering and Transports • n Department <br /> BY: Kenneth Joseph, City En ineer ! <br /> Engineering and Trans rtation Department/ <br /> SUBJECT PROJECT/PROJECT DESCRIPTION: <br /> RESOLUTION ACCEPTING WORK FOR THE 2660 EDEN ROAD GRADING AND DIRT <br /> DISPOSAL PROJECT, PROJECT NO. 09- 593 -52 -216. <br /> SUMMARY AND RECOMMENDATION <br /> Staff recommends acceptance of the work and filing of the Notice of Completion. <br /> BACKGROUND <br /> The site is located at the west end of Eden Road, adjacent to the Water Pollution Control Plant <br /> (WPCP). The site was used as an automobile "junk yard" from approximately 1950 to 1989 and <br /> then used to stockpile and recycle soil. The pile measured approximately 400 feet long by 100 <br /> feet wide and was 37 feet high. <br /> In 2006, the property was acquired by the City to accommodate the expansion of the WPCP <br /> facility. To make the property usable, the stockpiled material was removed and the site graded. <br /> As part of the Final Order of Condemnation for the site, City deposited $450,500.00 with the <br /> State Condemnation Fund. These monies were designated to partially fund the cleanup of the <br /> dirt and remediation of contamination. <br /> Analysis <br /> On September 7, 2010, the City awarded the construction contract for the subject project to <br /> Granite Rock Company. The project involved separation and stockpiling of clean dirt for reuse <br /> from the existing pile, and disposing contaminated and excess soil, including debris from the <br /> existing pile to designated disposal sites. The work also included regrading of the site and <br /> installation of temporary drainage inlets and pipes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.