Laserfiche WebLink
>,; BID SUMMARY • <br /> SAN 1 I { `f v Y+' L <br /> PROJECT TITLE: Roof Replacement & Accessories (Year 3) <br /> PROJECT NO.: 09-687-18-104 <br /> BID NO.: 10-11.016 <br /> BID OPENING ENGINEER'S ESTIMATE IMR Contractor Group Best Contracting Svcs., Inc. Reinhardt Roofing, Inc. <br /> DATE: Thursday, May 5, 2011 Date Approved: 5/5/2011 24967 Huntwood Avenue 29300 Pacific Street 8250 Enterprise Drive <br /> TIME: 3:00 PM Prepared by: NL Hayward, CA 94544 Hayward, CA 94544 Newark, CA 94560 <br /> LOCATION: City Clerk Phone: 510-293-0137 Phone: 510. 886 -7240 Phone: 510- 713 -7014 <br /> Fax: 510- 293 -0165 Fax: 510- 886 -7322 Fax: 510- 713 -2240 <br /> ITEM <br /> NO. QUANTITY ITEM UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST <br /> 1 1 LS Construction of Roof Repair and $170,000.00 5170,000.00 5200,000.00 5200,000.00 5215,800.00 $215,800.00 5207,782.00 $207,782.00 <br /> Accessories, complete and <br /> satisfactory operation, excluding <br /> items 2 to 7 <br /> 2 640 SF Replace damaged plywood deck $4.50 $2,880.00 $5.50 $3,520.00 54.22 $2,700.80 " $3.75 $2,400.00 <br /> (in like kind) <br /> 3 40 SF Patch abandoned roof $100.00 $4,000.00 $7.00 5280.00 $75.00 $3,000.00 $5.50 $220.00 <br /> penetration <br /> 4 8 EA Furnish and install new drain $800.00 $6,400.00 $1,100.00 $8,800.00 $397.50 53,180.00 $1,800.00 514,400.00 <br /> (cast iron, josem type, bowl ring <br /> 5 100 SF Replace damaged wood nailer $10.00 $1,000.00 $7.50 $750.00 $1.00 $100.00 54.50 5450.00 <br /> 6 10 SC/ Furnish and install fill pond $300.00 $3,000.00 $500.00 $5,000.00 5150.00 $1,500.00 $500.00 $5,000.00 <br /> patch <br /> 7 1 LS Asbestos and lead abatement $2,500.00 $2,500.00 $10,000.00 $10,000.00 $13,600.00 513,600.00 511,025.00 $11,025.00 <br /> TOTAL BASE BID: 5189,780.00 8228,350.00 $239,880.80 •• $241,277.00 •• <br /> SUBCONTRACTORS: American Eagle Environmental, B & M Tear Off RB Construction, Inc. <br /> Stronger Building Services <br /> SECURITIES: 10% Bid Bond 10% Bid Bond 10% Bid Bond <br /> NOTES: / •• Math Error Corrected •• Math Error Corrected <br /> Reviewed by: t / Date: ... ii <br /> Nelso am, Project Manager . <br /> Reviewed by: Date: S /(,'1( <br /> A 4/le Osakwe, Senior Engineer <br /> Bid Summary-Roof Replacement and Accessories (Year 3).xlsx Page 2 of 3 Printed 5/5/2011 © 4:25 PM <br />