>,; BID SUMMARY •
<br /> SAN 1 I { `f v Y+' L
<br /> PROJECT TITLE: Roof Replacement & Accessories (Year 3)
<br /> PROJECT NO.: 09-687-18-104
<br /> BID NO.: 10-11.016
<br /> BID OPENING ENGINEER'S ESTIMATE IMR Contractor Group Best Contracting Svcs., Inc. Reinhardt Roofing, Inc.
<br /> DATE: Thursday, May 5, 2011 Date Approved: 5/5/2011 24967 Huntwood Avenue 29300 Pacific Street 8250 Enterprise Drive
<br /> TIME: 3:00 PM Prepared by: NL Hayward, CA 94544 Hayward, CA 94544 Newark, CA 94560
<br /> LOCATION: City Clerk Phone: 510-293-0137 Phone: 510. 886 -7240 Phone: 510- 713 -7014
<br /> Fax: 510- 293 -0165 Fax: 510- 886 -7322 Fax: 510- 713 -2240
<br /> ITEM
<br /> NO. QUANTITY ITEM UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST
<br /> 1 1 LS Construction of Roof Repair and $170,000.00 5170,000.00 5200,000.00 5200,000.00 5215,800.00 $215,800.00 5207,782.00 $207,782.00
<br /> Accessories, complete and
<br /> satisfactory operation, excluding
<br /> items 2 to 7
<br /> 2 640 SF Replace damaged plywood deck $4.50 $2,880.00 $5.50 $3,520.00 54.22 $2,700.80 " $3.75 $2,400.00
<br /> (in like kind)
<br /> 3 40 SF Patch abandoned roof $100.00 $4,000.00 $7.00 5280.00 $75.00 $3,000.00 $5.50 $220.00
<br /> penetration
<br /> 4 8 EA Furnish and install new drain $800.00 $6,400.00 $1,100.00 $8,800.00 $397.50 53,180.00 $1,800.00 514,400.00
<br /> (cast iron, josem type, bowl ring
<br /> 5 100 SF Replace damaged wood nailer $10.00 $1,000.00 $7.50 $750.00 $1.00 $100.00 54.50 5450.00
<br /> 6 10 SC/ Furnish and install fill pond $300.00 $3,000.00 $500.00 $5,000.00 5150.00 $1,500.00 $500.00 $5,000.00
<br /> patch
<br /> 7 1 LS Asbestos and lead abatement $2,500.00 $2,500.00 $10,000.00 $10,000.00 $13,600.00 513,600.00 511,025.00 $11,025.00
<br /> TOTAL BASE BID: 5189,780.00 8228,350.00 $239,880.80 •• $241,277.00 ••
<br /> SUBCONTRACTORS: American Eagle Environmental, B & M Tear Off RB Construction, Inc.
<br /> Stronger Building Services
<br /> SECURITIES: 10% Bid Bond 10% Bid Bond 10% Bid Bond
<br /> NOTES: / •• Math Error Corrected •• Math Error Corrected
<br /> Reviewed by: t / Date: ... ii
<br /> Nelso am, Project Manager .
<br /> Reviewed by: Date: S /(,'1(
<br /> A 4/le Osakwe, Senior Engineer
<br /> Bid Summary-Roof Replacement and Accessories (Year 3).xlsx Page 2 of 3 Printed 5/5/2011 © 4:25 PM