Laserfiche WebLink
10.11 Professional Seal. Where applicable in the determination of the contract administrator, <br /> the first page of a technical report, first page of design specifications, and each page of <br /> construction drawings shall be stamped /sealed and signed by the licensed professional <br /> responsible for the report/design preparation. The stamp /seal shall be in a block entitled <br /> "Seal and Signature of Registered Professional with report/design responsibility," as in the <br /> following example. <br /> Seal and Signature of Registered Professional with <br /> report/design responsibility. <br /> 10.12 Integration. This Agreement, including the scope of work attached hereto and <br /> incorporated herein as Exhibits A and B represents the entire and integrated agreement <br /> between City and Consultant and supersedes all prior negotiations, representations, or <br /> agreements, either written or oral. <br /> Exhibit A <br /> Exhibit B <br /> 10.13 Counterparts. This Agreement may be executed in multiple counterparts, each of which <br /> shall be an original and all of which together shall constitute one agreement. <br /> [SIGNATURES ON FOLLOWING PAGE] <br /> Consulting Services Agreement between June 6, 2011 <br /> The Redevelopment Agency of the City of San Leandro and <br /> Tellus Venture Associates Page 13 of 14 <br />