BID SUMMARY
<br />� SIiN l�
<br />PROJECT TITLE: Toyon Park Restroom Replacement Sitework
<br />PROJECT NO.: 10- 210 -62 -008
<br />BID NO.: 10- 11.008
<br />This document is a summary of bids received for the subject project and are
<br />provided only as a convenience. Listing of a particular bid is not a finding that such
<br />bid has been found to be responsive or accepted as complete by the City. An award
<br />of contract, if any, is subject to approval of the City Council andfor the City Manager.
<br />Contractors should refer to the contract documents for bidding information.
<br />BID OPENING
<br />ENGINEER'S ESTIMATE
<br />McNabb Construction, Inc.
<br />Guerra Construction Group
<br />D & D Pipelines, Inc.
<br />DATE: Monday, June 13, 2011
<br />Date Approved: 05/16/2011
<br />3527 Mt. Diablo
<br />984 Memorex Drive
<br />629 Divisadero Street
<br />TIME: 3:00 PM
<br />Prepared by: MG
<br />Lafayette, CA 94549
<br />Santa Clara, CA 95050
<br />San Francisco, CA 94117
<br />LOCATION: City Clerk
<br />Phone: 925.935.4200
<br />Phone: 408- 279 -2027
<br />Phone: 415 -441 -2006
<br />Fax: 925-9524600
<br />Fax: 408-279-2044
<br />Fax: 415-441-2491
<br />ITEM
<br />NO.
<br />QUANTITY
<br />ITEM
<br />UNIT COST
<br />ITEM COST
<br />I UNIT COST
<br />I ITEM COST
<br />I UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />I ITEM COST
<br />1 LS
<br />urms all material, equipmen ,
<br />09V
<br />7 ,
<br />a ,00 .00
<br />aa,o00.ao
<br />1 4, 0.0
<br />000.0
<br />128,0 0. 0
<br />and labor to construct the work
<br />in the plans and /or
<br />specifications
<br />2
<br />1 LS
<br />Furnish all sheeting, shoring,
<br />$750.00
<br />$750.00
<br />$700.00
<br />$700.00
<br />$250.00
<br />$250.00
<br />$1,000.00
<br />$1,000.00
<br />and bracing as required.
<br />TOTAL BASE BID: $76,359.00
<br />$84,700.00
<br />$114,300.00
<br />$129,000.00
<br />BID ALTERNATE NO.
<br />1
<br />1 LS
<br />Furnish all material, equipment,
<br />$10,350.00
<br />$10,350.00
<br />$6,300.00
<br />$6,300.00
<br />$24,800.00
<br />$24,800.00
<br />$20,000.00
<br />$20,000.00
<br />and labor to construct the.
<br />irrigation controller, master
<br />valve, flow sensor, electrical
<br />conduit, and quick coupler as
<br />indicated in the plans or specs
<br />TOTAL BASE BID: $76,359.00 $84,700.00 $114,300.00 $129,000.00
<br />TOTAL BID ALTERNATE NO. 1: $10,360.00 $6,300.00 $24,800.00 $20,000.00
<br />TOTAL BID: $86,709.00 $91,000.00 $139,100.00 $149,000.00
<br />Bid Summary -Toyon Park Resiroom Replacement Silework.xis Page 1 of 2 Printed 8/13/2011 @ 3:59 PM