Laserfiche WebLink
BID SUMMARY <br />� SIiN l� <br />PROJECT TITLE: Toyon Park Restroom Replacement Sitework <br />PROJECT NO.: 10- 210 -62 -008 <br />BID NO.: 10- 11.008 <br />This document is a summary of bids received for the subject project and are <br />provided only as a convenience. Listing of a particular bid is not a finding that such <br />bid has been found to be responsive or accepted as complete by the City. An award <br />of contract, if any, is subject to approval of the City Council andfor the City Manager. <br />Contractors should refer to the contract documents for bidding information. <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />McNabb Construction, Inc. <br />Guerra Construction Group <br />D & D Pipelines, Inc. <br />DATE: Monday, June 13, 2011 <br />Date Approved: 05/16/2011 <br />3527 Mt. Diablo <br />984 Memorex Drive <br />629 Divisadero Street <br />TIME: 3:00 PM <br />Prepared by: MG <br />Lafayette, CA 94549 <br />Santa Clara, CA 95050 <br />San Francisco, CA 94117 <br />LOCATION: City Clerk <br />Phone: 925.935.4200 <br />Phone: 408- 279 -2027 <br />Phone: 415 -441 -2006 <br />Fax: 925-9524600 <br />Fax: 408-279-2044 <br />Fax: 415-441-2491 <br />ITEM <br />NO. <br />QUANTITY <br />ITEM <br />UNIT COST <br />ITEM COST <br />I UNIT COST <br />I ITEM COST <br />I UNIT COST <br />ITEM COST <br />UNIT COST <br />I ITEM COST <br />1 LS <br />urms all material, equipmen , <br />09V <br />7 , <br />a ,00 .00 <br />aa,o00.ao <br />1 4, 0.0 <br />000.0 <br />128,0 0. 0 <br />and labor to construct the work <br />in the plans and /or <br />specifications <br />2 <br />1 LS <br />Furnish all sheeting, shoring, <br />$750.00 <br />$750.00 <br />$700.00 <br />$700.00 <br />$250.00 <br />$250.00 <br />$1,000.00 <br />$1,000.00 <br />and bracing as required. <br />TOTAL BASE BID: $76,359.00 <br />$84,700.00 <br />$114,300.00 <br />$129,000.00 <br />BID ALTERNATE NO. <br />1 <br />1 LS <br />Furnish all material, equipment, <br />$10,350.00 <br />$10,350.00 <br />$6,300.00 <br />$6,300.00 <br />$24,800.00 <br />$24,800.00 <br />$20,000.00 <br />$20,000.00 <br />and labor to construct the. <br />irrigation controller, master <br />valve, flow sensor, electrical <br />conduit, and quick coupler as <br />indicated in the plans or specs <br />TOTAL BASE BID: $76,359.00 $84,700.00 $114,300.00 $129,000.00 <br />TOTAL BID ALTERNATE NO. 1: $10,360.00 $6,300.00 $24,800.00 $20,000.00 <br />TOTAL BID: $86,709.00 $91,000.00 $139,100.00 $149,000.00 <br />Bid Summary -Toyon Park Resiroom Replacement Silework.xis Page 1 of 2 Printed 8/13/2011 @ 3:59 PM <br />