Laserfiche WebLink
BID SUMMARY <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />Anderson Pacific Engineering <br />Shimmick Construction Co., Inc. <br />DATE: Wedneday, April 12, 2011 <br />Date Approved: 3/1612011 <br />1390 Norman Avenue <br />8201 Edgewater Drive, Ste. 202 <br />TIME: 3:00 PM <br />Prepared by: KC <br />Santa Clara, CA 95054 <br />Oakland, CA 94621 <br />LOCATION: City Clerk <br />Phone: 408 -870 -9900 <br />Phone: 510- 777 -5000 <br />Fax: 408- 970 -$975 <br />Fax: 610-777-5099 <br />ITEM <br />NO. <br />QUANTITY <br />ITEM <br />UNIT COST <br />ITEM COST UNIT COST <br />I ITEM COST <br />UNIT COST <br />ITEM COST <br />TOTAL BASE BID: $44,497,000.00 <br />$41,430,000.00 <br />$44,480,000.00 <br />TOTAL BID ALTERNATE NO. 1: <br />$4,056,000.00 <br />$8,080,000.00 <br />$5,300,000.00 <br />TOTAL BID: $48,553,000.00 <br />$47,810,000.00 <br />$49,780,000.00 <br />SUBCONTRACTORS: <br />Top Grade Construction, <br />Harris Salinas Reber, Ferma <br />International Lining Technology, <br />Corporation, S &S Trucking, MPC <br />WL Butler, SS Trucking, Ferma, <br />Containment International I.I.C. <br />Harris Salinas, Redwood Painting, <br />Economy Trucking, FD Thomas, <br />Malcom, Jeftco, Blocks, JBI, <br />RMT Landscape, Raito, Inc., <br />Ashron, Sliney Electric <br />Redwood Painting, TelStar, Metal <br />Set, Inc., Blocks <br />SECURITIES: <br />10% Bid Bond <br />109E Bid Bond <br />NOTES: <br />Reviewed by: o Date: #N1 1 1 <br />e un, Project Manager <br />vin <br />Reviewed by: Date: < < <br />e Osakwe, Senior Engineer <br />Bid Summary with Alternates -WPCP Rehab Project.xls Page a or 6 Printed 411W2011 Q 9:54 AM <br />