BID SUMMARY
<br />PROJECT TITLE: WPCP Rehabilitation Project
<br />PROJECT NO.: 08- 693.62 -239 "As was disch
<br />BID NO.: 10- 11.017
<br />BID OPENING
<br />ENGINEER'S ESTIMATE
<br />Anderson Pacific Engineering
<br />Shimmick Construction Co., Inc.
<br />DATE: Wedneday, April 12, 2011
<br />Date Approved: 31512011
<br />1390 Norman Avenue
<br />$201 Edgewater Drive, Ste. 202
<br />TIME: 3:00 PM
<br />Prepared by: KC
<br />Santa Clara, CA 95054
<br />Oakland, CA 94621
<br />LOCATION. City Clerk
<br />Phone: 408 - 970 -9900
<br />Phone: 510- 777 -5000
<br />Fax: 408 -970 -9975
<br />Fax. 610- 777 -5099
<br />ITEM
<br />NO.
<br />QUANTITY
<br />ITEM
<br />UNIT COST
<br />ITEM COST UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />BASE BID
<br />1
<br />1 LS
<br />Sheeting, shoring, and bracing
<br />$1,000,000.00
<br />$1,000,000.00 $2,000,000.00
<br />$2,000,000.00
<br />$3,000,000.00
<br />$3,000,000.00
<br />of all excavations
<br />2
<br />1 LS
<br />Preparation and submittal of a
<br />$50,000.00
<br />$60,000.00 $40,000.00
<br />$40,000.00
<br />$80,000.00
<br />$60,000.00
<br />written geotechnical report as
<br />specified in Section 02260
<br />3
<br />1 LS
<br />Preparation and submittal of
<br />$150,000.00
<br />$150,000.00 $150,000.00
<br />$150,000.00
<br />$150,000.00
<br />$150,000.00
<br />record drawings as specftd in
<br />Section 01720
<br />4
<br />1 LS
<br />Cerllfied Payroll as specified in
<br />$36,000.00
<br />$35,000.00 $20,000.00
<br />$20,000.00
<br />$20,000.00
<br />$20,000.00
<br />Section 000700 -7.2_k
<br />5
<br />1 LS
<br />Preparation and subitlal of
<br />$150,000.00
<br />$150,000.00 $150,000.00
<br />$150,000.00
<br />$150,000.00
<br />$150,000.00
<br />schedules specified in Section
<br />01324
<br />6
<br />1 LS
<br />All work required by the plans
<br />$43,111,000.00
<br />$43,111,000.00 $39,070,000.00
<br />$39,070,000.00
<br />$41,100,000.00
<br />$41,100,000.00
<br />and specifications except that
<br />Included in Bid Item Nos. 1 to 5
<br />and Bid Alternative A
<br />TOTAL BASE BID: $44, 497, 000.00 $41,430,000.00
<br />$44,480,000.00
<br />BID ALTERNATE NO.1
<br />28
<br />1 LS
<br />Administration Control Building
<br />$4,056,000.00
<br />$4,056,000.00
<br />$6,080,000.00
<br />$6,080,000.00
<br />$53,000,000.00
<br />$53,000,000.00
<br />Expansion
<br />1
<br />Old Summary with Alternates -WPCP Rehab Project.xls Page 5 of a Printed 411 512 01 1 @ 9:54 AM
<br />
|