My WebLink
|
Help
|
About
|
Sign Out
Home
8H Consent 2011 0705
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0705
>
8H Consent 2011 0705
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2011 9:32:05 AM
Creation date
6/30/2011 3:21:44 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/5/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0705
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0705
Reso 2011-132
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-133
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-134
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-135
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-136
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br />CITY OF SAN LEANDRO <br />WPCP REHABILITATION PROJECT <br />ENGINEERING SERVICES DURING CONSTRUCTION <br />SCOPE OF SERVICES <br />INTRODUCTION <br />The City of San Leandro (City) owns and operates a 7.6 -mgd rated average dry weather flow <br />(ADWF) Water Pollution Control Plant (WPCP) located in San Leandro, California. Carollo <br />Engineers (Consultant) has completed design of the WPCP Rehabilitation Project to restore the <br />capacity and function of the WPCP with improvements to various existing facilities and by <br />adding new facilities. Construction of the project will be performed by S.J. Amoroso <br />Construction Co., Inc. Construction Management of the project will be provided by the City. <br />Consultant's Scope of Services herein is to provide engineering services during construction <br />(ESDC) to the City's Construction Management team and plant staff. This Scope of Services is <br />based on a construction period of 690 working days (approximately 32 months) from <br />Contractor's notice to proceed. <br />SCOPE OF SERVICES <br />This section presents the Scope of Services for the WPCP Rehabilitation Project - Engineering <br />Services During Construction. This project will utilize EADOC software, a web -based <br />construction management software to be provided by the Contractor, to manage the majority of <br />electronic media and information used during construction. <br />Task 1 - Project Management and Meetings <br />Consultant shall provide the appropriate level of project administration and management of this <br />project, and attend specified meetings during the construction period. Rick Chan and James <br />Wickstrom will continue as project manager and project engineer, respectively, throughout the <br />duration of this project. <br />Task 1.1 - Project Management. Consultant shall provide the appropriate level of project <br />management and administration necessary for proper planning, filing, execution, monitoring, <br />quality control, and reporting of this project during the construction period. Consultant shall also <br />prepare a brief monthly progress summary letter report for attachment to the monthly invoice to <br />track status of budget expenditures by major task description in Exhibit B and key work <br />activities completed during that billing period. For this task, a budget equivalent to about 256 <br />hours have been included. <br />Information Provided by City: <br />Consulting Services Agreement between Project No. 08- 593 -52 -239 <br />City of San Leandro and Carollo Engineers, Inc. Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.